High-Frequency Strait Ro-Pax Freight Ferry
Product family: 45-Min Truck Marshalling Cycle.
Flow: International Road Hauliers → Check-In & Customs Pre-Clear → Security K9 / X-Ray Lane → Weight-Balanced Deck Lane Load → Strait Crossing & Shore Unlash → Express Port Exit Ramp → Cross-Strait Highway Link
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Check-In & Customs Pre-Clear | 115 s | 15 min | 93% | 99.1% | 240 | 480 (1.00 d) | 635 |
| 2. Security K9 / X-Ray Lane | 132 s | 10 min | 91% | 98.4% | 192 | 960 (2.00 d) | 539 |
| 3. Weight-Balanced Deck Lane Load | 182 s | 25 min | 82% | 92.0% | 240 | 1,248 (2.60 d) | 323 |
| 4. Strait Crossing & Shore Unlash | 125 s | 8 min | 94% | 97.6% | 96 | 432 (0.90 d) | 577 |
| 5. Express Port Exit Ramp | 95.0 s | 5 min | 97% | 98.6% | 72 | 240 (0.50 d) | 795 |
Key figures
- Takt time
- 169 s
- Lead time
- 7.81 d
- Value-added time
- 649 s
- Process cycle efficiency (PCE)
- 0.10%
- Rolled throughput yield (RTY)
- 86.3%
- Customer demand per day
- 480 TEU
- Line capacity per day
- 323 TEU
- Bottleneck
- Weight-Balanced Deck Lane Load
Reading the bottleneck
The bottleneck is "Weight-Balanced Deck Lane Load": it can process 323 TEU per day against a demand of 480 TEU, so it falls short of demand by 32.6%. Once downtime and scrap are counted, its cycle time grows from 182 s to 241 s, against a takt of 169 s. The largest loss at this step is equipment downtime (uptime 82%), about 40.0 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Ports, Maritime, Air Cargo & Customs: Ports, Maritime, Air Cargo & Customs
- Container Terminal & Customs Clearance
- Ro-Ro Finished Vehicle Port Import Terminal
- Widebody Freighter Air Cargo ULD Ground Hub
- Intermodal Sea-to-Rail RMG Gantry Transfer
- Free-Trade Zone Bonded Deconsolidation Hub
- 60,000T Panamax Port Grain Silo Discharge Hub
- Overnight Express Courier Hub Cross-Belt Sort
- Dedicated Fruit Terminal Reefer Pallet Discharge
- Heavy Lift Wind Blade & Transformer Port Berth
- Coastal Chemical & Edible Oil Jetty Tank Farm
- Inland Dry-Port Customs Clearance Rail Depot