Free-Trade Zone Bonded Deconsolidation Hub

Product family: LCL Consolidation & Re-Export.

Flow: FCL Import Containers → Bonded Container Stripping → Item Tally & HS Valuation → Value-Add Kitting & Label → Export T1 / Bill of Lading → FCL Re-Stuff & Feeder Vessel → Regional Export Markets

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Free-Trade Zone Bonded Deconsolidation HubSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. FCL Import Containers → Bonded Container Stripping (87.0 s) → Item Tally & HS Valuation (100 s) → Value-Add Kitting & Label (139 s) → Export T1 / Bill of Lading (95.0 s) → FCL Re-Stuff & Feeder Vessel (72.0 s) → Regional Export Markets.SUPPLIERFCL ImportContainersI1.00 d1Bonded ContainerStrippingC/T 87.0 sI2.00 d2Item Tally & HSValuationC/T 100 sI2.60 d3Value-Add Kitting& LabelC/T 139 sI0.90 d4Export T1 / Billof LadingC/T 95.0 sI0.50 d5FCL Re-Stuff &Feeder VesselC/T 72.0 sI0.80 dCUSTOMERRegional ExportMarkets420 / crates

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Bonded Container Stripping87.0 s15 min93%99.1%210420 (1.00 d)553
2. Item Tally & HS Valuation100 s10 min91%98.4%168840 (2.00 d)470
3. Value-Add Kitting & Label139 s25 min82%92.0%2101,092 (2.60 d)277
4. Export T1 / Bill of Lading95.0 s8 min94%97.6%84378 (0.90 d)498
5. FCL Re-Stuff & Feeder Vessel72.0 s5 min97%98.6%63210 (0.50 d)691

Key figures

Takt time
129 s
Lead time
7.81 d
Value-added time
493 s
Process cycle efficiency (PCE)
0.12%
Rolled throughput yield (RTY)
86.3%
Customer demand per day
420 crates
Line capacity per day
277 crates
Bottleneck
Value-Add Kitting & Label

Reading the bottleneck

The bottleneck is "Value-Add Kitting & Label": it can process 277 crates per day against a demand of 420 crates, so it falls short of demand by 34.1%. Once downtime and scrap are counted, its cycle time grows from 139 s to 184 s, against a takt of 129 s. The largest loss at this step is equipment downtime (uptime 82%), about 30.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.