Data Center Direct-to-Chip CDU Cooling Loop

Product family: 2MW Facility Heat-Rejection Fit.

Flow: Brazed Plate HX & Redundant Pumps → Stainless Header Orbital Weld → 25um Bypass Filtration Flush → Propylene Glycol Fill & Vent → Leak Detection Tape & Valves → Thermal Load Step-Response → AI Compute Halls

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Data Center Direct-to-Chip CDU Cooling LoopSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Brazed Plate HX & Redundant Pumps → Stainless Header Orbital Weld (4,455 s) → 25um Bypass Filtration Flush (5,535 s) → Propylene Glycol Fill & Vent (7,223 s) → Leak Detection Tape & Valves (4,995 s) → Thermal Load Step-Response (3,780 s) → AI Compute Halls.SUPPLIERBrazed Plate HX& RedundantPumpsI1.50 d1Stainless HeaderOrbital WeldC/T 4,455 sI1.50 d225um BypassFiltration FlushC/T 5,535 sI2.25 d3Propylene GlycolFill & VentC/T 7,223 sI1.00 d4Leak DetectionTape & ValvesC/T 4,995 sI0.50 d5Thermal LoadStep-ResponseC/T 3,780 sI0.75 dCUSTOMERAI ComputeHalls4 / skids

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Stainless Header Orbital Weld4,455 s15 min95%98.5%26 (1.50 d)5
2. 25um Bypass Filtration Flush5,535 s20 min92%97.6%26 (1.50 d)4
3. Propylene Glycol Fill & Vent7,223 s25 min85%94.8%29 (2.25 d)3
4. Leak Detection Tape & Valves4,995 s10 min95%98.2%14 (1.00 d)5
5. Thermal Load Step-Response3,780 s8 min97%99.4%12 (0.50 d)7

Key figures

Takt time
6,750 s
Lead time
8.46 d
Value-added time
25,988 s
Process cycle efficiency (PCE)
11.4%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
4 skids
Line capacity per day
3 skids
Bottleneck
Propylene Glycol Fill & Vent

Reading the bottleneck

The bottleneck is "Propylene Glycol Fill & Vent": it can process 3 skids per day against a demand of 4 skids, so it falls short of demand by 33.1%. Once downtime and scrap are counted, its cycle time grows from 7,223 s to 8,964 s, against a takt of 6,750 s. The largest loss at this step is equipment downtime (uptime 85%), about 1,275 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.