Factory L11 Pre-Integrated Liquid AI Server Rack

Product family: Plug-and-Play 100kW GPU Racks.

Flow: GPU Baseboard & Coolant CDUs → Cabinet Busbar & Manifold Mount → Server Sled & DAC/Optic Load → Glycol Flush & Helium Decay → IPMI Cluster Stress & NCCL Test → Shock-Pallet Crate Dispatch → Hyperscale AI Data Centers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Factory L11 Pre-Integrated Liquid AI Server RackSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. GPU Baseboard & Coolant CDUs → Cabinet Busbar & Manifold Mount (1,980 s) → Server Sled & DAC/Optic Load (2,460 s) → Glycol Flush & Helium Decay (3,210 s) → IPMI Cluster Stress & NCCL Test (2,220 s) → Shock-Pallet Crate Dispatch (1,680 s) → Hyperscale AI Data Centers.SUPPLIERGPU Baseboard &Coolant CDUsI1.39 d1Cabinet Busbar &Manifold MountC/T 1,980 sI1.61 d2Server Sled &DAC/Optic LoadC/T 2,460 sI2.22 d3Glycol Flush &Helium DecayC/T 3,210 sI0.89 d4IPMI ClusterStress & NCCL…C/T 2,220 sI0.61 d5Shock-PalletCrate DispatchC/T 1,680 sI0.72 dCUSTOMERHyperscale AIData Centers18 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Cabinet Busbar & Manifold Mount1,980 s15 min95%98.5%925 (1.39 d)25
2. Server Sled & DAC/Optic Load2,460 s20 min92%97.6%729 (1.61 d)19
3. Glycol Flush & Helium Decay3,210 s25 min85%94.8%940 (2.22 d)13
4. IPMI Cluster Stress & NCCL Test2,220 s10 min95%98.2%516 (0.89 d)22
5. Shock-Pallet Crate Dispatch1,680 s8 min97%99.4%411 (0.61 d)30

Key figures

Takt time
3,000 s
Lead time
7.66 d
Value-added time
11,550 s
Process cycle efficiency (PCE)
2.8%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
18 units
Line capacity per day
13 units
Bottleneck
Glycol Flush & Helium Decay

Reading the bottleneck

The bottleneck is "Glycol Flush & Helium Decay": it can process 13 units per day against a demand of 18 units, so it falls short of demand by 28.9%. Once downtime and scrap are counted, its cycle time grows from 3,210 s to 3,984 s, against a takt of 3,000 s. The largest loss at this step is equipment downtime (uptime 85%), about 566 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Cloud Data Centers & Hyperscale Infra: Cloud Data Centers & Hyperscale Infra