Automated Immutable Air-Gap Backup Restore Test

Product family: Monthly Ransomware Recovery Drill.

Flow: Immutable S3 & Tape Vaults → Snapshot Catalog Integrity Pick → Isolated Cleanroom Sandbox Boot → Malware Scan Inside Image → DB Consistency & Checksum QC → Compliance Auditor Signed PDF → Enterprise CISO Compliance

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Automated Immutable Air-Gap Backup Restore TestSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Immutable S3 & Tape Vaults → Snapshot Catalog Integrity Pick (509 s) → Isolated Cleanroom Sandbox Boot (633 s) → Malware Scan Inside Image (825 s) → DB Consistency & Checksum QC (571 s) → Compliance Auditor Signed PDF (432 s) → Enterprise CISO Compliance.SUPPLIERImmutable S3 &Tape VaultsI1.40 d1Snapshot CatalogIntegrity PickC/T 509 sI1.60 d2IsolatedCleanroom Sandbo…C/T 633 sI2.20 d3Malware ScanInside ImageC/T 825 sI0.91 d4DB Consistency &Checksum QCC/T 571 sI0.60 d5ComplianceAuditor Signed…C/T 432 sI0.71 dCUSTOMEREnterprise CISOCompliance35 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Snapshot Catalog Integrity Pick509 s15 min95%98.5%1849 (1.40 d)46
2. Isolated Cleanroom Sandbox Boot633 s20 min92%97.6%1456 (1.60 d)34
3. Malware Scan Inside Image825 s25 min85%94.8%1877 (2.20 d)24
4. DB Consistency & Checksum QC571 s10 min95%98.2%932 (0.91 d)40
5. Compliance Auditor Signed PDF432 s8 min97%99.4%721 (0.60 d)55

Key figures

Takt time
771 s
Lead time
7.54 d
Value-added time
2,970 s
Process cycle efficiency (PCE)
1.5%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
35 batches
Line capacity per day
24 batches
Bottleneck
Malware Scan Inside Image

Reading the bottleneck

The bottleneck is "Malware Scan Inside Image": it can process 24 batches per day against a demand of 35 batches, so it falls short of demand by 32.8%. Once downtime and scrap are counted, its cycle time grows from 825 s to 1,024 s, against a takt of 771 s. The largest loss at this step is equipment downtime (uptime 85%), about 146 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Cloud Data Centers & Hyperscale Infra: Cloud Data Centers & Hyperscale Infra