Data Center 2MW Diesel Gen & UPS Load-Bank Test

Product family: Tier-IV Integrated IST Test.

Flow: Portable Resistive Load Banks → Load-Bank Cable Hookup & Lock → 0–100% Step Load Transient Run → UPS Failover Black-Start Cycle → IR Thermography Busbar Check → Cx Level-4 Commissioning Cert → Data Center Commissioning

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Data Center 2MW Diesel Gen & UPS Load-Bank TestSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Portable Resistive Load Banks → Load-Bank Cable Hookup & Lock (2,970 s) → 0–100% Step Load Transient Run (3,690 s) → UPS Failover Black-Start Cycle (4,815 s) → IR Thermography Busbar Check (3,330 s) → Cx Level-4 Commissioning Cert (2,520 s) → Data Center Commissioning.SUPPLIERPortableResistive LoadBanksI1.33 d1Load-Bank CableHookup & LockC/T 2,970 sI1.67 d20–100% Step LoadTransient RunC/T 3,690 sI2.17 d3UPS FailoverBlack-Start CycleC/T 4,815 sI0.83 d4IR ThermographyBusbar CheckC/T 3,330 sI0.67 d5Cx Level-4Commissioning…C/T 2,520 sI0.67 dCUSTOMERData CenterCommissioning6 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Load-Bank Cable Hookup & Lock2,970 s15 min95%98.5%38 (1.33 d)8
2. 0–100% Step Load Transient Run3,690 s20 min92%97.6%210 (1.67 d)6
3. UPS Failover Black-Start Cycle4,815 s25 min85%94.8%313 (2.17 d)4
4. IR Thermography Busbar Check3,330 s10 min95%98.2%25 (0.83 d)7
5. Cx Level-4 Commissioning Cert2,520 s8 min97%99.4%14 (0.67 d)10

Key figures

Takt time
4,500 s
Lead time
7.98 d
Value-added time
17,325 s
Process cycle efficiency (PCE)
8.0%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
6 cases
Line capacity per day
4 cases
Bottleneck
UPS Failover Black-Start Cycle

Reading the bottleneck

The bottleneck is "UPS Failover Black-Start Cycle": it can process 4 cases per day against a demand of 6 cases, so it falls short of demand by 33.1%. Once downtime and scrap are counted, its cycle time grows from 4,815 s to 5,975 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 850 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.