Enterprise Private Colocation Cage Handover

Product family: Biometric Power-Ready Cages.

Flow: Mesh Caging & Dual-Feed PDUs → Steel Mesh & Containment Erect → Dual A+B Whip & Meter Connect → Biometric Badge & CCTV Tie → Thermal Cold-Aisle Smoke QC → Customer Handover Key Walk → Financial Colocation Clients

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Enterprise Private Colocation Cage HandoverSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Mesh Caging & Dual-Feed PDUs → Steel Mesh & Containment Erect (2,970 s) → Dual A+B Whip & Meter Connect (3,690 s) → Biometric Badge & CCTV Tie (4,815 s) → Thermal Cold-Aisle Smoke QC (3,330 s) → Customer Handover Key Walk (2,520 s) → Financial Colocation Clients.SUPPLIERMesh Caging &Dual-Feed PDUsI1.33 d1Steel Mesh &Containment ErectC/T 2,970 sI1.67 d2Dual A+B Whip &Meter ConnectC/T 3,690 sI2.17 d3Biometric Badge &CCTV TieC/T 4,815 sI0.83 d4ThermalCold-Aisle Smoke…C/T 3,330 sI0.67 d5Customer HandoverKey WalkC/T 2,520 sI0.67 dCUSTOMERFinancialColocation…6 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Steel Mesh & Containment Erect2,970 s15 min95%98.5%38 (1.33 d)8
2. Dual A+B Whip & Meter Connect3,690 s20 min92%97.6%210 (1.67 d)6
3. Biometric Badge & CCTV Tie4,815 s25 min85%94.8%313 (2.17 d)4
4. Thermal Cold-Aisle Smoke QC3,330 s10 min95%98.2%25 (0.83 d)7
5. Customer Handover Key Walk2,520 s8 min97%99.4%14 (0.67 d)10

Key figures

Takt time
4,500 s
Lead time
7.98 d
Value-added time
17,325 s
Process cycle efficiency (PCE)
8.0%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
6 cases
Line capacity per day
4 cases
Bottleneck
Biometric Badge & CCTV Tie

Reading the bottleneck

The bottleneck is "Biometric Badge & CCTV Tie": it can process 4 cases per day against a demand of 6 cases, so it falls short of demand by 33.1%. Once downtime and scrap are counted, its cycle time grows from 4,815 s to 5,975 s, against a takt of 4,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 850 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.