1024-GPU InfiniBand NDR Fat-Tree Cluster Cable

Product family: Lossless AI Fabric Deployment.

Flow: 400G/800G OSFP Optical Cables → Switch Topology Port Mapping → Overhead Tray MPO Cable Pull → 800G Transceiver Inspect & Seat → Subnet Manager Topology Lock → All-Reduce RDMA Fabric Audit → Foundation Model Clusters

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 1024-GPU InfiniBand NDR Fat-Tree Cluster CableSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. 400G/800G OSFP Optical Cables → Switch Topology Port Mapping (8,910 s) → Overhead Tray MPO Cable Pull (11,070 s) → 800G Transceiver Inspect & Seat (14,445 s) → Subnet Manager Topology Lock (9,990 s) → All-Reduce RDMA Fabric Audit (7,560 s) → Foundation Model Clusters.SUPPLIER400G/800G OSFPOptical CablesI1.50 d1Switch TopologyPort MappingC/T 8,910 sI1.50 d2Overhead Tray MPOCable PullC/T 11,070 sI2.25 d3800G TransceiverInspect & SeatC/T 14,445 sI1.00 d4Subnet ManagerTopology LockC/T 9,990 sI0.50 d5All-Reduce RDMAFabric AuditC/T 7,560 sI0.75 dCUSTOMERFoundationModel Clusters4 / batches

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Switch Topology Port Mapping8,910 s15 min95%98.5%26 (1.50 d)5
2. Overhead Tray MPO Cable Pull11,070 s20 min92%97.6%26 (1.50 d)4
3. 800G Transceiver Inspect & Seat14,445 s25 min85%94.8%29 (2.25 d)3
4. Subnet Manager Topology Lock9,990 s10 min95%98.2%14 (1.00 d)5
5. All-Reduce RDMA Fabric Audit7,560 s8 min97%99.4%12 (0.50 d)7

Key figures

Takt time
13,500 s
Lead time
8.46 d
Value-added time
51,975 s
Process cycle efficiency (PCE)
11.4%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
4 batches
Line capacity per day
3 batches
Bottleneck
800G Transceiver Inspect & Seat

Reading the bottleneck

The bottleneck is "800G Transceiver Inspect & Seat": it can process 3 batches per day against a demand of 4 batches, so it falls short of demand by 28.9%. Once downtime and scrap are counted, its cycle time grows from 14,445 s to 17,926 s, against a takt of 13,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 2,549 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.