Data Center High-Rate VRLA / Lithium String Swap

Product family: Live Zero-Load-Drop Replacement.

Flow: 480V DC Battery Cabinets → Single-String DC Breaker Open → Old Cell Pull & Hazmat Pallet → New Torqued Busbar & Thermal → Equalize Charge & Internal Ohmic → Parallel Re-Sync onto UPS Bus → Mission-Critical Facilities

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Data Center High-Rate VRLA / Lithium String SwapSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. 480V DC Battery Cabinets → Single-String DC Breaker Open (1,485 s) → Old Cell Pull & Hazmat Pallet (1,845 s) → New Torqued Busbar & Thermal (2,408 s) → Equalize Charge & Internal Ohmic (1,665 s) → Parallel Re-Sync onto UPS Bus (1,260 s) → Mission-Critical Facilities.SUPPLIER480V DC BatteryCabinetsI1.42 d1Single-String DCBreaker OpenC/T 1,485 sI1.58 d2Old Cell Pull &Hazmat PalletC/T 1,845 sI2.17 d3New TorquedBusbar & ThermalC/T 2,408 sI0.92 d4Equalize Charge &Internal OhmicC/T 1,665 sI0.58 d5Parallel Re-Synconto UPS BusC/T 1,260 sI0.67 dCUSTOMERMission-CriticalFacilities12 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Single-String DC Breaker Open1,485 s15 min95%98.5%617 (1.42 d)16
2. Old Cell Pull & Hazmat Pallet1,845 s20 min92%97.6%519 (1.58 d)12
3. New Torqued Busbar & Thermal2,408 s25 min85%94.8%626 (2.17 d)8
4. Equalize Charge & Internal Ohmic1,665 s10 min95%98.2%311 (0.92 d)14
5. Parallel Re-Sync onto UPS Bus1,260 s8 min97%99.4%27 (0.58 d)18

Key figures

Takt time
2,250 s
Lead time
7.65 d
Value-added time
8,663 s
Process cycle efficiency (PCE)
4.2%
Rolled throughput yield (RTY)
89.0%
Customer demand per day
12 cases
Line capacity per day
8 cases
Bottleneck
New Torqued Busbar & Thermal

Reading the bottleneck

The bottleneck is "New Torqued Busbar & Thermal": it can process 8 cases per day against a demand of 12 cases, so it falls short of demand by 33.1%. Once downtime and scrap are counted, its cycle time grows from 2,408 s to 2,988 s, against a takt of 2,250 s. The largest loss at this step is equipment downtime (uptime 85%), about 425 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.