Hub Airport Automated Baggage Sort & Flight Make-Up

Product family: 4,500 Bags/Hr RFID Tote Loop.

Flow: Check-In & Transfer Flights → Check-In RFID Tag & Weight → 5-Level EDS CT Bomb Screening → High-Speed Tilt-Tray Transfer → Late-Bag Manual Re-Inject Hold → Robot ULD Loading & Ramp Drop → Widebody Aircraft ULDs

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Hub Airport Automated Baggage Sort & Flight Make-UpSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Check-In & Transfer Flights → Check-In RFID Tag & Weight (2.8 s) → 5-Level EDS CT Bomb Screening (4.8 s) → High-Speed Tilt-Tray Transfer (3.5 s) → Late-Bag Manual Re-Inject Hold (3.2 s) → Robot ULD Loading & Ramp Drop (2.3 s) → Widebody Aircraft ULDs.SUPPLIERCheck-In &TransferFlightsI0.60 d1Check-In RFID Tag& WeightC/T 2.8 sI1.20 d25-Level EDS CTBomb ScreeningC/T 4.8 sI0.70 d3High-SpeedTilt-Tray…C/T 3.5 sI0.50 d4Late-Bag ManualRe-Inject HoldC/T 3.2 sI0.30 d5Robot ULD Loading& Ramp DropC/T 2.3 sI0.30 dCUSTOMERWidebodyAircraft ULDs18,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Check-In RFID Tag & Weight2.8 s5 min97%98.4%3,60010,800 (0.60 d)27,100
2. 5-Level EDS CT Bomb Screening4.8 s10 min86%94.5%2,70021,600 (1.20 d)13,037
3. High-Speed Tilt-Tray Transfer3.5 s8 min94%98.1%2,70012,600 (0.70 d)20,498
4. Late-Bag Manual Re-Inject Hold3.2 s8 min95%98.8%2,7009,000 (0.50 d)22,820
5. Robot ULD Loading & Ramp Drop2.3 s4 min98%99.4%1,8005,400 (0.30 d)33,289

Key figures

Takt time
4.5 s
Lead time
3.60 d
Value-added time
16.6 s
Process cycle efficiency (PCE)
0.006%
Rolled throughput yield (RTY)
89.6%
Customer demand per day
18,000 packs
Line capacity per day
13,037 packs
Bottleneck
5-Level EDS CT Bomb Screening

Reading the bottleneck

The bottleneck is "5-Level EDS CT Bomb Screening": it can process 13,037 packs per day against a demand of 18,000 packs, so it falls short of demand by 27.6%. Once downtime and scrap are counted, its cycle time grows from 4.8 s to 5.9 s, against a takt of 4.5 s. The largest loss at this step is equipment downtime (uptime 86%), about 0.8 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.