Airport Passenger Check-In, Bag Drop & CT Security

Product family: 15-Min Curb-to-Gate Flow.

Flow: Terminal Arrivals Curbside → Biometric Kiosk & Bag Tag Drop → e-Gate Boarding Pass Scan → CT 3D Lane Screening Peak → Automated Passport e-Gate → Airside Concourse Release → Departure Boarding Gates

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Airport Passenger Check-In, Bag Drop & CT SecuritySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Terminal Arrivals Curbside → Biometric Kiosk & Bag Tag Drop (2.4 s) → e-Gate Boarding Pass Scan (4.1 s) → CT 3D Lane Screening Peak (3.0 s) → Automated Passport e-Gate (2.8 s) → Airside Concourse Release (1.9 s) → Departure Boarding Gates.SUPPLIERTerminalArrivalsCurbsideI0.60 d1Biometric Kiosk &Bag Tag DropC/T 2.4 sI1.20 d2e-Gate BoardingPass ScanC/T 4.1 sI0.70 d3CT 3D LaneScreening PeakC/T 3.0 sI0.50 d4AutomatedPassport e-GateC/T 2.8 sI0.30 d5Airside ConcourseReleaseC/T 1.9 sI0.30 dCUSTOMERDepartureBoarding Gates14,000 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Biometric Kiosk & Bag Tag Drop2.4 s5 min97%98.4%2,8008,400 (0.60 d)20,879
2. e-Gate Boarding Pass Scan4.1 s10 min86%94.5%2,10016,800 (1.20 d)9,911
3. CT 3D Lane Screening Peak3.0 s8 min94%98.1%2,1009,800 (0.70 d)15,615
4. Automated Passport e-Gate2.8 s8 min95%98.8%2,1007,000 (0.50 d)17,029
5. Airside Concourse Release1.9 s4 min98%99.4%1,4004,200 (0.30 d)26,455

Key figures

Takt time
3.9 s
Lead time
3.60 d
Value-added time
14.2 s
Process cycle efficiency (PCE)
0.007%
Rolled throughput yield (RTY)
89.6%
Customer demand per day
14,000 patients
Line capacity per day
9,911 patients
Bottleneck
e-Gate Boarding Pass Scan

Reading the bottleneck

The bottleneck is "e-Gate Boarding Pass Scan": it can process 9,911 patients per day against a demand of 14,000 patients, so it falls short of demand by 29.2%. Once downtime and scrap are counted, its cycle time grows from 4.1 s to 5.0 s, against a takt of 3.9 s. The largest loss at this step is equipment downtime (uptime 86%), about 0.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Airports, Urban Transit & Postal Sorting: Airports, Urban Transit & Postal Sorting