Automated ANPR Airport Taxi Dispatch Pool Lot
Product family: Zero-Wait Curb Passenger Match.
Flow: City Licensed Taxis / EVs → Geofence Staging Lot Entry → EV Clean-Air Priority Lane → Terminal Curb Demand Trigger → Barrier Gate Dispatch Ticket → Curb Pax Load in 45s → Arriving Terminal Flyers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Geofence Staging Lot Entry | 27.9 s | 5 min | 97% | 98.4% | 360 | 1,080 (0.60 d) | 2,720 |
| 2. EV Clean-Air Priority Lane | 48.0 s | 10 min | 86% | 94.5% | 270 | 2,160 (1.20 d) | 1,304 |
| 3. Terminal Curb Demand Trigger | 35.1 s | 8 min | 94% | 98.1% | 270 | 1,260 (0.70 d) | 2,044 |
| 4. Barrier Gate Dispatch Ticket | 32.4 s | 8 min | 95% | 98.8% | 270 | 900 (0.50 d) | 2,254 |
| 5. Curb Pax Load in 45s | 22.5 s | 4 min | 98% | 99.4% | 180 | 540 (0.30 d) | 3,403 |
Key figures
- Takt time
- 45.0 s
- Lead time
- 3.60 d
- Value-added time
- 166 s
- Process cycle efficiency (PCE)
- 0.057%
- Rolled throughput yield (RTY)
- 89.6%
- Customer demand per day
- 1,800 orders
- Line capacity per day
- 1,304 orders
- Bottleneck
- EV Clean-Air Priority Lane
Reading the bottleneck
The bottleneck is "EV Clean-Air Priority Lane": it can process 1,304 orders per day against a demand of 1,800 orders, so it falls short of demand by 27.6%. Once downtime and scrap are counted, its cycle time grows from 48.0 s to 59.1 s, against a takt of 45.0 s. The largest loss at this step is equipment downtime (uptime 86%), about 7.8 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Airports, Urban Transit & Postal Sorting: Airports, Urban Transit & Postal Sorting
- Hub Airport Automated Baggage Sort & Flight Make-Up
- Airport Passenger Check-In, Bag Drop & CT Security
- Urban Light-Rail Tramway Night Depot Maintenance
- 200-Bus Zero-Emission Electric Transit Night Charge
- Automated OCR 40,000/Hr Postal Letter & Flat Sort
- Commuter EMU Train Bogie Brake Pad & HVAC Pit
- Automated Highway Electronic ETC Tag Provisioning
- Municipal Ambulance Fleet Bio-Wash & Narcotic Stock
- Municipal Smart-Bin Compactor Collection Route
- Municipal Fire Station Turnout Gear Decontamination
- City Electric Bike-Share Battery Swap & Rebalance