Municipal Smart-Bin Compactor Collection Route
Product family: Sensor-Triggered City Waste.
Flow: LoRa Bin Level Sensors → 04:00 AM Dynamic Sensor Route → Side-Loader Automated Lift → Traffic Bottleneck Re-Route → Transfer Station Weigh Tip → Washdown & Charger Dock → MRF / Waste-to-Energy
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. 04:00 AM Dynamic Sensor Route | 176 s | 5 min | 97% | 98.4% | 19 | 57 (0.60 d) | 138 |
| 2. Side-Loader Automated Lift | 304 s | 10 min | 86% | 94.5% | 14 | 114 (1.20 d) | 61 |
| 3. Traffic Bottleneck Re-Route | 222 s | 8 min | 94% | 98.1% | 14 | 67 (0.71 d) | 99 |
| 4. Transfer Station Weigh Tip | 205 s | 8 min | 95% | 98.8% | 14 | 48 (0.51 d) | 109 |
| 5. Washdown & Charger Dock | 142 s | 4 min | 98% | 99.4% | 10 | 29 (0.31 d) | 170 |
Key figures
- Takt time
- 284 s
- Lead time
- 3.66 d
- Value-added time
- 1,049 s
- Process cycle efficiency (PCE)
- 1.1%
- Rolled throughput yield (RTY)
- 89.6%
- Customer demand per day
- 95 batches
- Line capacity per day
- 61 batches
- Bottleneck
- Side-Loader Automated Lift
Reading the bottleneck
The bottleneck is "Side-Loader Automated Lift": it can process 61 batches per day against a demand of 95 batches, so it falls short of demand by 35.5%. Once downtime and scrap are counted, its cycle time grows from 304 s to 374 s, against a takt of 284 s. The largest loss at this step is equipment downtime (uptime 86%), about 49.5 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Airports, Urban Transit & Postal Sorting: Airports, Urban Transit & Postal Sorting
- Hub Airport Automated Baggage Sort & Flight Make-Up
- Airport Passenger Check-In, Bag Drop & CT Security
- Urban Light-Rail Tramway Night Depot Maintenance
- 200-Bus Zero-Emission Electric Transit Night Charge
- Automated OCR 40,000/Hr Postal Letter & Flat Sort
- Commuter EMU Train Bogie Brake Pad & HVAC Pit
- Automated Highway Electronic ETC Tag Provisioning
- Municipal Ambulance Fleet Bio-Wash & Narcotic Stock
- Automated ANPR Airport Taxi Dispatch Pool Lot
- Municipal Fire Station Turnout Gear Decontamination
- City Electric Bike-Share Battery Swap & Rebalance