200-Bus Zero-Emission Electric Transit Night Charge

Product family: Smart Load-Managed Pull-Out.

Flow: Off-Peak 150kW Depot Feed → DriverSOC & Fault Pad Plug-In → Exterior Brush Wash & Sweep → Smart V2G Tariff Night Charge → Pre-Heat Cabin Winter Pre-Cond → Assigned Morning Block Exit → 05:00 AM Line Headways

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 200-Bus Zero-Emission Electric Transit Night ChargeSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Off-Peak 150kW Depot Feed → DriverSOC & Fault Pad Plug-In (84.0 s) → Exterior Brush Wash & Sweep (144 s) → Smart V2G Tariff Night Charge (105 s) → Pre-Heat Cabin Winter Pre-Cond (97.0 s) → Assigned Morning Block Exit (68.0 s) → 05:00 AM Line Headways.SUPPLIEROff-Peak 150kWDepot FeedI0.60 d1DriverSOC & FaultPad Plug-InC/T 84.0 sI1.20 d2Exterior BrushWash & SweepC/T 144 sI0.70 d3Smart V2G TariffNight ChargeC/T 105 sI0.50 d4Pre-Heat CabinWinter Pre-CondC/T 97.0 sI0.30 d5Assigned MorningBlock ExitC/T 68.0 sI0.30 dCUSTOMER05:00 AM LineHeadways200 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. DriverSOC & Fault Pad Plug-In84.0 s5 min97%98.4%40120 (0.60 d)290
2. Exterior Brush Wash & Sweep144 s10 min86%94.5%30240 (1.20 d)130
3. Smart V2G Tariff Night Charge105 s8 min94%98.1%30140 (0.70 d)209
4. Pre-Heat Cabin Winter Pre-Cond97.0 s8 min95%98.8%30100 (0.50 d)230
5. Assigned Morning Block Exit68.0 s4 min98%99.4%2060 (0.30 d)352

Key figures

Takt time
135 s
Lead time
3.62 d
Value-added time
498 s
Process cycle efficiency (PCE)
0.51%
Rolled throughput yield (RTY)
89.6%
Customer demand per day
200 units
Line capacity per day
130 units
Bottleneck
Exterior Brush Wash & Sweep

Reading the bottleneck

The bottleneck is "Exterior Brush Wash & Sweep": it can process 130 units per day against a demand of 200 units, so it falls short of demand by 35.1%. Once downtime and scrap are counted, its cycle time grows from 144 s to 177 s, against a takt of 135 s. The largest loss at this step is equipment downtime (uptime 86%), about 23.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.