Urban Light-Rail Tramway Night Depot Maintenance

Product family: 04:30 AM 100% Fleet Pull-Out.

Flow: Wheel Flange & Pantograph Kits → Evening Return Wash & Sand Fill → Under-Floor Pit Brake & Bogie → Roof Pantograph Carbon Swap → Wheel Lathe True Round Fix → 04:00 AM Pre-Run Sign-Off → Morning City Commuters

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Urban Light-Rail Tramway Night Depot MaintenanceSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Wheel Flange & Pantograph Kits → Evening Return Wash & Sand Fill (349 s) → Under-Floor Pit Brake & Bogie (602 s) → Roof Pantograph Carbon Swap (439 s) → Wheel Lathe True Round Fix (405 s) → 04:00 AM Pre-Run Sign-Off (281 s) → Morning City Commuters.SUPPLIERWheel Flange &Pantograph KitsI0.60 d1Evening ReturnWash & Sand FillC/T 349 sI1.21 d2Under-Floor PitBrake & BogieC/T 602 sI0.71 d3Roof PantographCarbon SwapC/T 439 sI0.50 d4Wheel Lathe TrueRound FixC/T 405 sI0.29 d504:00 AM Pre-RunSign-OffC/T 281 sI0.29 dCUSTOMERMorning CityCommuters48 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Evening Return Wash & Sand Fill349 s5 min97%98.4%1029 (0.60 d)70
2. Under-Floor Pit Brake & Bogie602 s10 min86%94.5%758 (1.21 d)31
3. Roof Pantograph Carbon Swap439 s8 min94%98.1%734 (0.71 d)50
4. Wheel Lathe True Round Fix405 s8 min95%98.8%724 (0.50 d)55
5. 04:00 AM Pre-Run Sign-Off281 s4 min98%99.4%514 (0.29 d)86

Key figures

Takt time
563 s
Lead time
3.68 d
Value-added time
2,076 s
Process cycle efficiency (PCE)
2.1%
Rolled throughput yield (RTY)
89.6%
Customer demand per day
48 units
Line capacity per day
31 units
Bottleneck
Under-Floor Pit Brake & Bogie

Reading the bottleneck

The bottleneck is "Under-Floor Pit Brake & Bogie": it can process 31 units per day against a demand of 48 units, so it falls short of demand by 35.6%. Once downtime and scrap are counted, its cycle time grows from 602 s to 741 s, against a takt of 563 s. The largest loss at this step is equipment downtime (uptime 86%), about 98.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Airports, Urban Transit & Postal Sorting: Airports, Urban Transit & Postal Sorting