Municipal Fire Station Turnout Gear Decontamination

Product family: ISO-23616 Carcinogen Wash Loop.

Flow: Active Firehouse Crews → Contaminated Bag Barcode Intake → Specialized Non-Ionic Wash → Hydrostatic Membrane Seam QC → Reparative Patch & Reflective → Clean Station Locker Return → Municipal Firefighters

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Municipal Fire Station Turnout Gear DecontaminationSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Active Firehouse Crews → Contaminated Bag Barcode Intake (349 s) → Specialized Non-Ionic Wash (602 s) → Hydrostatic Membrane Seam QC (439 s) → Reparative Patch & Reflective (405 s) → Clean Station Locker Return (281 s) → Municipal Firefighters.SUPPLIERActiveFirehouse CrewsI0.60 d1Contaminated BagBarcode IntakeC/T 349 sI1.21 d2SpecializedNon-Ionic WashC/T 602 sI0.71 d3HydrostaticMembrane Seam QCC/T 439 sI0.50 d4Reparative Patch& ReflectiveC/T 405 sI0.29 d5Clean StationLocker ReturnC/T 281 sI0.29 dCUSTOMERMunicipalFirefighters48 / garments

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Contaminated Bag Barcode Intake349 s5 min97%98.4%1029 (0.60 d)70
2. Specialized Non-Ionic Wash602 s10 min86%94.5%758 (1.21 d)31
3. Hydrostatic Membrane Seam QC439 s8 min94%98.1%734 (0.71 d)50
4. Reparative Patch & Reflective405 s8 min95%98.8%724 (0.50 d)55
5. Clean Station Locker Return281 s4 min98%99.4%514 (0.29 d)86

Key figures

Takt time
563 s
Lead time
3.68 d
Value-added time
2,076 s
Process cycle efficiency (PCE)
2.1%
Rolled throughput yield (RTY)
89.6%
Customer demand per day
48 garments
Line capacity per day
31 garments
Bottleneck
Specialized Non-Ionic Wash

Reading the bottleneck

The bottleneck is "Specialized Non-Ionic Wash": it can process 31 garments per day against a demand of 48 garments, so it falls short of demand by 35.6%. Once downtime and scrap are counted, its cycle time grows from 602 s to 741 s, against a takt of 563 s. The largest loss at this step is equipment downtime (uptime 86%), about 98.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Airports, Urban Transit & Postal Sorting: Airports, Urban Transit & Postal Sorting