Automated OCR 40,000/Hr Postal Letter & Flat Sort
Product family: Walk-Sequenced Carrier Bundles.
Flow: City Postboxes & Bulk Mailers → Culler-Facer-Canceller Induct → AI OCR Address Read & Video → 200-Pocket Carrier Walk Sort → Plastic Tray Strapping Loop → Early Morning Van Bay Load → Neighborhood Delivery Vans
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Culler-Facer-Canceller Induct | 1.2 s | 5 min | 97% | 98.4% | 8,400 | 25,200 (0.60 d) | 41,759 |
| 2. AI OCR Address Read & Video | 1.4 s | 10 min | 86% | 94.5% | 6,300 | 50,400 (1.20 d) | 29,025 |
| 3. 200-Pocket Carrier Walk Sort | 1.2 s | 8 min | 94% | 98.1% | 6,300 | 29,400 (0.70 d) | 39,037 |
| 4. Plastic Tray Strapping Loop | 1.2 s | 8 min | 95% | 98.8% | 6,300 | 21,000 (0.50 d) | 39,734 |
| 5. Early Morning Van Bay Load | 1.2 s | 4 min | 98% | 99.4% | 4,200 | 12,600 (0.30 d) | 41,887 |
Key figures
- Takt time
- 1.3 s
- Lead time
- 3.60 d
- Value-added time
- 6.2 s
- Process cycle efficiency (PCE)
- 0.003%
- Rolled throughput yield (RTY)
- 89.6%
- Customer demand per day
- 42,000 orders
- Line capacity per day
- 29,025 orders
- Bottleneck
- AI OCR Address Read & Video
Reading the bottleneck
The bottleneck is "AI OCR Address Read & Video": it can process 29,025 orders per day against a demand of 42,000 orders, so it falls short of demand by 30.9%. Once downtime and scrap are counted, its cycle time grows from 1.4 s to 1.7 s, against a takt of 1.3 s. The largest loss at this step is equipment downtime (uptime 86%), about 0.2 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Airports, Urban Transit & Postal Sorting: Airports, Urban Transit & Postal Sorting
- Hub Airport Automated Baggage Sort & Flight Make-Up
- Airport Passenger Check-In, Bag Drop & CT Security
- Urban Light-Rail Tramway Night Depot Maintenance
- 200-Bus Zero-Emission Electric Transit Night Charge
- Commuter EMU Train Bogie Brake Pad & HVAC Pit
- Automated Highway Electronic ETC Tag Provisioning
- Municipal Ambulance Fleet Bio-Wash & Narcotic Stock
- Municipal Smart-Bin Compactor Collection Route
- Automated ANPR Airport Taxi Dispatch Pool Lot
- Municipal Fire Station Turnout Gear Decontamination
- City Electric Bike-Share Battery Swap & Rebalance