City Electric Bike-Share Battery Swap & Rebalance
Product family: Dynamic Peak Commute Dock Loop.
Flow: Overnight Li-Ion Charge Hub → Telemetry Low-Battery Van Map → Hot-Swap 48V Pack at Curb → Brake/Tire Safety Quick Scan → Flatbed Redistribute to Hub → Rider App Green-Icon Unlock → Morning Rail Station Docks
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Telemetry Low-Battery Van Map | 27.0 s | 5 min | 97% | 98.4% | 124 | 372 (0.60 d) | 901 |
| 2. Hot-Swap 48V Pack at Curb | 47.0 s | 10 min | 86% | 94.5% | 93 | 744 (1.20 d) | 398 |
| 3. Brake/Tire Safety Quick Scan | 34.0 s | 8 min | 94% | 98.1% | 93 | 434 (0.70 d) | 645 |
| 4. Flatbed Redistribute to Hub | 31.4 s | 8 min | 95% | 98.8% | 93 | 310 (0.50 d) | 711 |
| 5. Rider App Green-Icon Unlock | 21.8 s | 4 min | 98% | 99.4% | 62 | 186 (0.30 d) | 1,099 |
Key figures
- Takt time
- 43.5 s
- Lead time
- 3.61 d
- Value-added time
- 161 s
- Process cycle efficiency (PCE)
- 0.17%
- Rolled throughput yield (RTY)
- 89.6%
- Customer demand per day
- 620 units
- Line capacity per day
- 398 units
- Bottleneck
- Hot-Swap 48V Pack at Curb
Reading the bottleneck
The bottleneck is "Hot-Swap 48V Pack at Curb": it can process 398 units per day against a demand of 620 units, so it falls short of demand by 35.9%. Once downtime and scrap are counted, its cycle time grows from 47.0 s to 57.8 s, against a takt of 43.5 s. The largest loss at this step is equipment downtime (uptime 86%), about 7.7 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Airports, Urban Transit & Postal Sorting: Airports, Urban Transit & Postal Sorting
- Hub Airport Automated Baggage Sort & Flight Make-Up
- Airport Passenger Check-In, Bag Drop & CT Security
- Urban Light-Rail Tramway Night Depot Maintenance
- 200-Bus Zero-Emission Electric Transit Night Charge
- Automated OCR 40,000/Hr Postal Letter & Flat Sort
- Commuter EMU Train Bogie Brake Pad & HVAC Pit
- Automated Highway Electronic ETC Tag Provisioning
- Municipal Ambulance Fleet Bio-Wash & Narcotic Stock
- Municipal Smart-Bin Compactor Collection Route
- Automated ANPR Airport Taxi Dispatch Pool Lot
- Municipal Fire Station Turnout Gear Decontamination