Commuter EMU Train Bogie Brake Pad & HVAC Pit

Product family: 6-Car Express Turnaround.

Flow: UIC Brake Discs & Filters → Depot Track Shunt & Cat-Off → Pit Inspection & Pad Change → Pneumatic Door & Brake Test → Saloon Graffiti & Seat Clean → ATP Signalling & Dispatch Out → Regional Rail Passengers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Commuter EMU Train Bogie Brake Pad & HVAC PitSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. UIC Brake Discs & Filters → Depot Track Shunt & Cat-Off (1,395 s) → Pit Inspection & Pad Change (2,408 s) → Pneumatic Door & Brake Test (1,755 s) → Saloon Graffiti & Seat Clean (1,620 s) → ATP Signalling & Dispatch Out (1,125 s) → Regional Rail Passengers.SUPPLIERUIC Brake Discs& FiltersI0.58 d1Depot Track Shunt& Cat-OffC/T 1,395 sI1.21 d2Pit Inspection &Pad ChangeC/T 2,408 sI0.71 d3Pneumatic Door &Brake TestC/T 1,755 sI0.50 d4Saloon Graffiti &Seat CleanC/T 1,620 sI0.29 d5ATP Signalling &Dispatch OutC/T 1,125 sI0.29 dCUSTOMERRegional RailPassengers24 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Depot Track Shunt & Cat-Off1,395 s5 min97%98.4%514 (0.58 d)36
2. Pit Inspection & Pad Change2,408 s10 min86%94.5%429 (1.21 d)17
3. Pneumatic Door & Brake Test1,755 s8 min94%98.1%417 (0.71 d)27
4. Saloon Graffiti & Seat Clean1,620 s8 min95%98.8%412 (0.50 d)30
5. ATP Signalling & Dispatch Out1,125 s4 min98%99.4%27 (0.29 d)44

Key figures

Takt time
2,250 s
Lead time
3.74 d
Value-added time
8,303 s
Process cycle efficiency (PCE)
4.1%
Rolled throughput yield (RTY)
89.6%
Customer demand per day
24 units
Line capacity per day
17 units
Bottleneck
Pit Inspection & Pad Change

Reading the bottleneck

The bottleneck is "Pit Inspection & Pad Change": it can process 17 units per day against a demand of 24 units, so it falls short of demand by 29.1%. Once downtime and scrap are counted, its cycle time grows from 2,408 s to 2,963 s, against a takt of 2,250 s. The largest loss at this step is equipment downtime (uptime 86%), about 392 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.