Municipal Ambulance Fleet Bio-Wash & Narcotic Stock
Product family: 20-Min Hub Make-Ready Shift.
Flow: EMS Hospital Supply Hub → Crew Sign-Off & Bio-Trash Pull → Hydrogen Peroxide Fog Sanitize → Sealed Med & O2 Cylinder Swap → Defibrillator & Pump Check → GPS Zone Post Ready → 911 / 112 City Zones
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Crew Sign-Off & Bio-Trash Pull | 739 s | 5 min | 97% | 98.4% | 14 | 41 (0.60 d) | 103 |
| 2. Hydrogen Peroxide Fog Sanitize | 1,275 s | 10 min | 86% | 94.5% | 10 | 82 (1.21 d) | 49 |
| 3. Sealed Med & O2 Cylinder Swap | 929 s | 8 min | 94% | 98.1% | 10 | 48 (0.71 d) | 77 |
| 4. Defibrillator & Pump Check | 858 s | 8 min | 95% | 98.8% | 10 | 34 (0.50 d) | 85 |
| 5. GPS Zone Post Ready | 596 s | 4 min | 98% | 99.4% | 7 | 20 (0.29 d) | 129 |
Key figures
- Takt time
- 1,191 s
- Lead time
- 3.66 d
- Value-added time
- 4,397 s
- Process cycle efficiency (PCE)
- 1.5%
- Rolled throughput yield (RTY)
- 89.6%
- Customer demand per day
- 68 units
- Line capacity per day
- 49 units
- Bottleneck
- Hydrogen Peroxide Fog Sanitize
Reading the bottleneck
The bottleneck is "Hydrogen Peroxide Fog Sanitize": it can process 49 units per day against a demand of 68 units, so it falls short of demand by 27.9%. Once downtime and scrap are counted, its cycle time grows from 1,275 s to 1,569 s, against a takt of 1,191 s. The largest loss at this step is equipment downtime (uptime 86%), about 208 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Airports, Urban Transit & Postal Sorting: Airports, Urban Transit & Postal Sorting
- Hub Airport Automated Baggage Sort & Flight Make-Up
- Airport Passenger Check-In, Bag Drop & CT Security
- Urban Light-Rail Tramway Night Depot Maintenance
- 200-Bus Zero-Emission Electric Transit Night Charge
- Automated OCR 40,000/Hr Postal Letter & Flat Sort
- Commuter EMU Train Bogie Brake Pad & HVAC Pit
- Automated Highway Electronic ETC Tag Provisioning
- Municipal Smart-Bin Compactor Collection Route
- Automated ANPR Airport Taxi Dispatch Pool Lot
- Municipal Fire Station Turnout Gear Decontamination
- City Electric Bike-Share Battery Swap & Rebalance