Multi-Site Commercial HVAC Preventive Maintenance

Product family: CMMS Mobile Work Order Flow.

Flow: Filter & Belt Wholesalers → IoT Fault / 90-Day PM Trigger → Tech Dispatch & Spare Pick → Coil Clean, Filter & Belt Swap → Mobile Checklist Photo Sign → Asset Health MTBF Sync → Facility Property Managers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Multi-Site Commercial HVAC Preventive MaintenanceSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Filter & Belt Wholesalers → IoT Fault / 90-Day PM Trigger (120 s) → Tech Dispatch & Spare Pick (206 s) → Coil Clean, Filter & Belt Swap (162 s) → Mobile Checklist Photo Sign (135 s) → Asset Health MTBF Sync (93.0 s) → Facility Property Managers.SUPPLIERFilter & BeltWholesalersI1.50 d1IoT Fault /90-Day PM TriggerC/T 120 sI3.20 d2Tech Dispatch &Spare PickC/T 206 sI1.80 d3Coil Clean,Filter & Belt…C/T 162 sI0.90 d4Mobile ChecklistPhoto SignC/T 135 sI0.40 d5Asset Health MTBFSyncC/T 93.0 sI0.40 dCUSTOMERFacilityProperty…140 / tickets

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. IoT Fault / 90-Day PM Trigger120 s10 min97%91.5%42210 (1.50 d)185
2. Tech Dispatch & Spare Pick206 s15 min86%88.5%35448 (3.20 d)86
3. Coil Clean, Filter & Belt Swap162 s15 min91%95.8%28252 (1.80 d)121
4. Mobile Checklist Photo Sign135 s8 min95%97.8%21126 (0.90 d)164
5. Asset Health MTBF Sync93.0 s5 min98%99.1%1456 (0.40 d)251

Key figures

Takt time
193 s
Lead time
8.23 d
Value-added time
716 s
Process cycle efficiency (PCE)
0.32%
Rolled throughput yield (RTY)
75.2%
Customer demand per day
140 tickets
Line capacity per day
86 tickets
Bottleneck
Tech Dispatch & Spare Pick

Reading the bottleneck

The bottleneck is "Tech Dispatch & Spare Pick": it can process 86 tickets per day against a demand of 140 tickets, so it falls short of demand by 38.2%. Once downtime and scrap are counted, its cycle time grows from 206 s to 271 s, against a takt of 193 s. The largest loss at this step is equipment downtime (uptime 86%), about 33.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.