Annual Statutory Elevator & Escalator Safety Audit

Product family: EN-81 Certified Inspection Loop.

Flow: Accredited Inspection Technicians → Statutory 12-Mo Scheduling → Owner Pit Access & Prep → Brake, Rope & Speed Governor → Defect Notice 30-Day Re-Check → QR Cab Safety Certificate → Tower Building Owners

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Annual Statutory Elevator & Escalator Safety AuditSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Accredited Inspection Technicians → Statutory 12-Mo Scheduling (258 s) → Owner Pit Access & Prep (444 s) → Brake, Rope & Speed Governor (349 s) → Defect Notice 30-Day Re-Check (291 s) → QR Cab Safety Certificate (199 s) → Tower Building Owners.SUPPLIERAccreditedInspectionTechniciansI1.51 d1Statutory 12-MoSchedulingC/T 258 sI3.20 d2Owner Pit Access& PrepC/T 444 sI1.80 d3Brake, Rope &Speed GovernorC/T 349 sI0.91 d4Defect Notice30-Day Re-CheckC/T 291 sI0.40 d5QR Cab SafetyCertificateC/T 199 sI0.40 dCUSTOMERTower BuildingOwners65 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Statutory 12-Mo Scheduling258 s10 min97%91.5%2098 (1.51 d)86
2. Owner Pit Access & Prep444 s15 min86%88.5%16208 (3.20 d)40
3. Brake, Rope & Speed Governor349 s15 min91%95.8%13117 (1.80 d)56
4. Defect Notice 30-Day Re-Check291 s8 min95%97.8%1059 (0.91 d)76
5. QR Cab Safety Certificate199 s5 min98%99.1%726 (0.40 d)118

Key figures

Takt time
415 s
Lead time
8.27 d
Value-added time
1,541 s
Process cycle efficiency (PCE)
0.69%
Rolled throughput yield (RTY)
75.2%
Customer demand per day
65 units
Line capacity per day
40 units
Bottleneck
Owner Pit Access & Prep

Reading the bottleneck

The bottleneck is "Owner Pit Access & Prep": it can process 40 units per day against a demand of 65 units, so it falls short of demand by 38.4%. Once downtime and scrap are counted, its cycle time grows from 444 s to 583 s, against a takt of 415 s. The largest loss at this step is equipment downtime (uptime 86%), about 72.3 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.