Annual Statutory Elevator & Escalator Safety Audit
Product family: EN-81 Certified Inspection Loop.
Flow: Accredited Inspection Technicians → Statutory 12-Mo Scheduling → Owner Pit Access & Prep → Brake, Rope & Speed Governor → Defect Notice 30-Day Re-Check → QR Cab Safety Certificate → Tower Building Owners
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Statutory 12-Mo Scheduling | 258 s | 10 min | 97% | 91.5% | 20 | 98 (1.51 d) | 86 |
| 2. Owner Pit Access & Prep | 444 s | 15 min | 86% | 88.5% | 16 | 208 (3.20 d) | 40 |
| 3. Brake, Rope & Speed Governor | 349 s | 15 min | 91% | 95.8% | 13 | 117 (1.80 d) | 56 |
| 4. Defect Notice 30-Day Re-Check | 291 s | 8 min | 95% | 97.8% | 10 | 59 (0.91 d) | 76 |
| 5. QR Cab Safety Certificate | 199 s | 5 min | 98% | 99.1% | 7 | 26 (0.40 d) | 118 |
Key figures
- Takt time
- 415 s
- Lead time
- 8.27 d
- Value-added time
- 1,541 s
- Process cycle efficiency (PCE)
- 0.69%
- Rolled throughput yield (RTY)
- 75.2%
- Customer demand per day
- 65 units
- Line capacity per day
- 40 units
- Bottleneck
- Owner Pit Access & Prep
Reading the bottleneck
The bottleneck is "Owner Pit Access & Prep": it can process 40 units per day against a demand of 65 units, so it falls short of demand by 38.4%. Once downtime and scrap are counted, its cycle time grows from 444 s to 583 s, against a takt of 415 s. The largest loss at this step is equipment downtime (uptime 86%), about 72.3 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Real Estate Dev, Permits & Facility Ops: Real Estate Dev, Permits & Facility Ops
- Municipal Digital BIM Building Permit Review
- Corporate Office Fit-Out Design-Build Handover
- Multi-Site Commercial HVAC Preventive Maintenance
- Pre-Handover New Apartment Snagging & Close
- Commercial Building Deep Energy & Heat-Pump Retro
- Pre-Demolition Hazardous Asbestos Abatement Flow
- Build-to-Rent Apartment Move-Out Make-Ready
- Institutional Portfolio RICS Property Appraisal
- Multi-Tenant Commercial Smart Water/Elec Metering
- Multi-Unit Residential Garage EV Charger Install
- Drone LiDAR Topographic & Cadastral Land Survey