Multi-Tenant Commercial Smart Water/Elec Metering
Product family: Automated ESG Tenant Billing.
Flow: LoRaWAN Pulse Sub-Meters → Panel Breaker Survey & Window → Night Split-Core CT & LoRa Fit → Gateway Commissioning Ping → Tenant Portal Tariff Mapping → Monthly Automated Utility Bill → Shopping Malls & Offices
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Panel Breaker Survey & Window | 349 s | 10 min | 97% | 91.5% | 14 | 72 (1.50 d) | 63 |
| 2. Night Split-Core CT & LoRa Fit | 602 s | 15 min | 86% | 88.5% | 12 | 154 (3.21 d) | 30 |
| 3. Gateway Commissioning Ping | 473 s | 15 min | 91% | 95.8% | 10 | 86 (1.79 d) | 42 |
| 4. Tenant Portal Tariff Mapping | 394 s | 8 min | 95% | 97.8% | 7 | 43 (0.90 d) | 56 |
| 5. Monthly Automated Utility Bill | 270 s | 5 min | 98% | 99.1% | 5 | 19 (0.40 d) | 87 |
Key figures
- Takt time
- 563 s
- Lead time
- 8.26 d
- Value-added time
- 2,088 s
- Process cycle efficiency (PCE)
- 0.94%
- Rolled throughput yield (RTY)
- 75.2%
- Customer demand per day
- 48 units
- Line capacity per day
- 30 units
- Bottleneck
- Night Split-Core CT & LoRa Fit
Reading the bottleneck
The bottleneck is "Night Split-Core CT & LoRa Fit": it can process 30 units per day against a demand of 48 units, so it falls short of demand by 38.4%. Once downtime and scrap are counted, its cycle time grows from 602 s to 791 s, against a takt of 563 s. The largest loss at this step is equipment downtime (uptime 86%), about 98.0 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Real Estate Dev, Permits & Facility Ops: Real Estate Dev, Permits & Facility Ops
- Municipal Digital BIM Building Permit Review
- Corporate Office Fit-Out Design-Build Handover
- Multi-Site Commercial HVAC Preventive Maintenance
- Pre-Handover New Apartment Snagging & Close
- Commercial Building Deep Energy & Heat-Pump Retro
- Annual Statutory Elevator & Escalator Safety Audit
- Pre-Demolition Hazardous Asbestos Abatement Flow
- Build-to-Rent Apartment Move-Out Make-Ready
- Institutional Portfolio RICS Property Appraisal
- Multi-Unit Residential Garage EV Charger Install
- Drone LiDAR Topographic & Cadastral Land Survey