Multi-Tenant Commercial Smart Water/Elec Metering

Product family: Automated ESG Tenant Billing.

Flow: LoRaWAN Pulse Sub-Meters → Panel Breaker Survey & Window → Night Split-Core CT & LoRa Fit → Gateway Commissioning Ping → Tenant Portal Tariff Mapping → Monthly Automated Utility Bill → Shopping Malls & Offices

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Multi-Tenant Commercial Smart Water/Elec MeteringSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. LoRaWAN Pulse Sub-Meters → Panel Breaker Survey & Window (349 s) → Night Split-Core CT & LoRa Fit (602 s) → Gateway Commissioning Ping (473 s) → Tenant Portal Tariff Mapping (394 s) → Monthly Automated Utility Bill (270 s) → Shopping Malls & Offices.SUPPLIERLoRaWAN PulseSub-MetersI1.50 d1Panel BreakerSurvey & WindowC/T 349 sI3.21 d2Night Split-CoreCT & LoRa FitC/T 602 sI1.79 d3GatewayCommissioning…C/T 473 sI0.90 d4Tenant PortalTariff MappingC/T 394 sI0.40 d5Monthly AutomatedUtility BillC/T 270 sI0.40 dCUSTOMERShopping Malls& Offices48 / units

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Panel Breaker Survey & Window349 s10 min97%91.5%1472 (1.50 d)63
2. Night Split-Core CT & LoRa Fit602 s15 min86%88.5%12154 (3.21 d)30
3. Gateway Commissioning Ping473 s15 min91%95.8%1086 (1.79 d)42
4. Tenant Portal Tariff Mapping394 s8 min95%97.8%743 (0.90 d)56
5. Monthly Automated Utility Bill270 s5 min98%99.1%519 (0.40 d)87

Key figures

Takt time
563 s
Lead time
8.26 d
Value-added time
2,088 s
Process cycle efficiency (PCE)
0.94%
Rolled throughput yield (RTY)
75.2%
Customer demand per day
48 units
Line capacity per day
30 units
Bottleneck
Night Split-Core CT & LoRa Fit

Reading the bottleneck

The bottleneck is "Night Split-Core CT & LoRa Fit": it can process 30 units per day against a demand of 48 units, so it falls short of demand by 38.4%. Once downtime and scrap are counted, its cycle time grows from 602 s to 791 s, against a takt of 563 s. The largest loss at this step is equipment downtime (uptime 86%), about 98.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Real Estate Dev, Permits & Facility Ops: Real Estate Dev, Permits & Facility Ops