Commercial Building Deep Energy & Heat-Pump Retro

Product family: EPC Decarbonization Upgrade.

Flow: Heat Pump & LED OEMs → ASHRAE Level-2 Energy Audit → Subsidy Grant & CapEx Sign → Weekend AHU Heat-Pump Swap → Smart Meter & BMS Optimize → EPC Grade-A Cert Issue → Commercial Landlord Funds

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Commercial Building Deep Energy & Heat-Pump RetroSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Heat Pump & LED OEMs → ASHRAE Level-2 Energy Audit (2,093 s) → Subsidy Grant & CapEx Sign (3,611 s) → Weekend AHU Heat-Pump Swap (2,835 s) → Smart Meter & BMS Optimize (2,363 s) → EPC Grade-A Cert Issue (1,620 s) → Commercial Landlord Funds.SUPPLIERHeat Pump & LEDOEMsI1.50 d1ASHRAE Level-2Energy AuditC/T 2,093 sI3.25 d2Subsidy Grant &CapEx SignC/T 3,611 sI1.75 d3Weekend AHUHeat-Pump SwapC/T 2,835 sI0.88 d4Smart Meter & BMSOptimizeC/T 2,363 sI0.38 d5EPC Grade-A CertIssueC/T 1,620 sI0.38 dCUSTOMERCommercialLandlord Funds8 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. ASHRAE Level-2 Energy Audit2,093 s10 min97%91.5%212 (1.50 d)10
2. Subsidy Grant & CapEx Sign3,611 s15 min86%88.5%226 (3.25 d)5
3. Weekend AHU Heat-Pump Swap2,835 s15 min91%95.8%214 (1.75 d)7
4. Smart Meter & BMS Optimize2,363 s8 min95%97.8%17 (0.88 d)10
5. EPC Grade-A Cert Issue1,620 s5 min98%99.1%13 (0.38 d)16

Key figures

Takt time
3,375 s
Lead time
8.59 d
Value-added time
12,522 s
Process cycle efficiency (PCE)
5.4%
Rolled throughput yield (RTY)
75.2%
Customer demand per day
8 cases
Line capacity per day
5 cases
Bottleneck
Subsidy Grant & CapEx Sign

Reading the bottleneck

The bottleneck is "Subsidy Grant & CapEx Sign": it can process 5 cases per day against a demand of 8 cases, so it falls short of demand by 38.3%. Once downtime and scrap are counted, its cycle time grows from 3,611 s to 4,744 s, against a takt of 3,375 s. The largest loss at this step is equipment downtime (uptime 86%), about 588 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Real Estate Dev, Permits & Facility Ops: Real Estate Dev, Permits & Facility Ops