Pre-Handover New Apartment Snagging & Close
Product family: Zero-Defect Residential Keys.
Flow: Subcontractor Finish Trades → Tablet Room Defect Walk App → Auto-Assign Trade Work Orders → Trade Rectification & Photo → Owner Final Walkthrough Sign → Keys & Smart Warranty Pack → New Home Buyers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Tablet Room Defect Walk App | 598 s | 10 min | 97% | 91.5% | 8 | 42 (1.50 d) | 37 |
| 2. Auto-Assign Trade Work Orders | 1,032 s | 15 min | 86% | 88.5% | 7 | 90 (3.21 d) | 17 |
| 3. Trade Rectification & Photo | 810 s | 15 min | 91% | 95.8% | 6 | 50 (1.79 d) | 25 |
| 4. Owner Final Walkthrough Sign | 675 s | 8 min | 95% | 97.8% | 4 | 25 (0.89 d) | 33 |
| 5. Keys & Smart Warranty Pack | 463 s | 5 min | 98% | 99.1% | 3 | 11 (0.39 d) | 51 |
Key figures
- Takt time
- 964 s
- Lead time
- 8.31 d
- Value-added time
- 3,578 s
- Process cycle efficiency (PCE)
- 1.6%
- Rolled throughput yield (RTY)
- 75.2%
- Customer demand per day
- 28 rooms
- Line capacity per day
- 17 rooms
- Bottleneck
- Auto-Assign Trade Work Orders
Reading the bottleneck
The bottleneck is "Auto-Assign Trade Work Orders": it can process 17 rooms per day against a demand of 28 rooms, so it falls short of demand by 38.4%. Once downtime and scrap are counted, its cycle time grows from 1,032 s to 1,356 s, against a takt of 964 s. The largest loss at this step is equipment downtime (uptime 86%), about 168 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Real Estate Dev, Permits & Facility Ops: Real Estate Dev, Permits & Facility Ops
- Municipal Digital BIM Building Permit Review
- Corporate Office Fit-Out Design-Build Handover
- Multi-Site Commercial HVAC Preventive Maintenance
- Commercial Building Deep Energy & Heat-Pump Retro
- Annual Statutory Elevator & Escalator Safety Audit
- Pre-Demolition Hazardous Asbestos Abatement Flow
- Build-to-Rent Apartment Move-Out Make-Ready
- Institutional Portfolio RICS Property Appraisal
- Multi-Tenant Commercial Smart Water/Elec Metering
- Multi-Unit Residential Garage EV Charger Install
- Drone LiDAR Topographic & Cadastral Land Survey