Pre-Demolition Hazardous Asbestos Abatement Flow
Product family: Negative-Pressure Containment.
Flow: Accredited Asbestos Labs & Landfills → Bulk Material Lab Survey → Sealed Poly Containment Tent → Wet Removal & HEPA Vac Bag → Clearance Air PCM Micro-Check → Manifested Hazardous Landfill → Urban Redevelopment Sites
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Bulk Material Lab Survey | 1,674 s | 10 min | 97% | 91.5% | 3 | 15 (1.50 d) | 13 |
| 2. Sealed Poly Containment Tent | 2,889 s | 15 min | 86% | 88.5% | 3 | 32 (3.20 d) | 6 |
| 3. Wet Removal & HEPA Vac Bag | 2,268 s | 15 min | 91% | 95.8% | 2 | 18 (1.80 d) | 9 |
| 4. Clearance Air PCM Micro-Check | 1,890 s | 8 min | 95% | 97.8% | 2 | 9 (0.90 d) | 12 |
| 5. Manifested Hazardous Landfill | 1,296 s | 5 min | 98% | 99.1% | 1 | 4 (0.40 d) | 20 |
Key figures
- Takt time
- 2,700 s
- Lead time
- 8.57 d
- Value-added time
- 10,017 s
- Process cycle efficiency (PCE)
- 4.3%
- Rolled throughput yield (RTY)
- 75.2%
- Customer demand per day
- 10 cases
- Line capacity per day
- 6 cases
- Bottleneck
- Sealed Poly Containment Tent
Reading the bottleneck
The bottleneck is "Sealed Poly Containment Tent": it can process 6 cases per day against a demand of 10 cases, so it falls short of demand by 36.8%. Once downtime and scrap are counted, its cycle time grows from 2,889 s to 3,796 s, against a takt of 2,700 s. The largest loss at this step is equipment downtime (uptime 86%), about 470 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Real Estate Dev, Permits & Facility Ops: Real Estate Dev, Permits & Facility Ops
- Municipal Digital BIM Building Permit Review
- Corporate Office Fit-Out Design-Build Handover
- Multi-Site Commercial HVAC Preventive Maintenance
- Pre-Handover New Apartment Snagging & Close
- Commercial Building Deep Energy & Heat-Pump Retro
- Annual Statutory Elevator & Escalator Safety Audit
- Build-to-Rent Apartment Move-Out Make-Ready
- Institutional Portfolio RICS Property Appraisal
- Multi-Tenant Commercial Smart Water/Elec Metering
- Multi-Unit Residential Garage EV Charger Install
- Drone LiDAR Topographic & Cadastral Land Survey