Pre-Demolition Hazardous Asbestos Abatement Flow

Product family: Negative-Pressure Containment.

Flow: Accredited Asbestos Labs & Landfills → Bulk Material Lab Survey → Sealed Poly Containment Tent → Wet Removal & HEPA Vac Bag → Clearance Air PCM Micro-Check → Manifested Hazardous Landfill → Urban Redevelopment Sites

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Pre-Demolition Hazardous Asbestos Abatement FlowSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Accredited Asbestos Labs & Landfills → Bulk Material Lab Survey (1,674 s) → Sealed Poly Containment Tent (2,889 s) → Wet Removal & HEPA Vac Bag (2,268 s) → Clearance Air PCM Micro-Check (1,890 s) → Manifested Hazardous Landfill (1,296 s) → Urban Redevelopment Sites.SUPPLIERAccreditedAsbestos Labs &LandfillsI1.50 d1Bulk Material LabSurveyC/T 1,674 sI3.20 d2Sealed PolyContainment TentC/T 2,889 sI1.80 d3Wet Removal &HEPA Vac BagC/T 2,268 sI0.90 d4Clearance Air PCMMicro-CheckC/T 1,890 sI0.40 d5ManifestedHazardous…C/T 1,296 sI0.40 dCUSTOMERUrbanRedevelopment…10 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Bulk Material Lab Survey1,674 s10 min97%91.5%315 (1.50 d)13
2. Sealed Poly Containment Tent2,889 s15 min86%88.5%332 (3.20 d)6
3. Wet Removal & HEPA Vac Bag2,268 s15 min91%95.8%218 (1.80 d)9
4. Clearance Air PCM Micro-Check1,890 s8 min95%97.8%29 (0.90 d)12
5. Manifested Hazardous Landfill1,296 s5 min98%99.1%14 (0.40 d)20

Key figures

Takt time
2,700 s
Lead time
8.57 d
Value-added time
10,017 s
Process cycle efficiency (PCE)
4.3%
Rolled throughput yield (RTY)
75.2%
Customer demand per day
10 cases
Line capacity per day
6 cases
Bottleneck
Sealed Poly Containment Tent

Reading the bottleneck

The bottleneck is "Sealed Poly Containment Tent": it can process 6 cases per day against a demand of 10 cases, so it falls short of demand by 36.8%. Once downtime and scrap are counted, its cycle time grows from 2,889 s to 3,796 s, against a takt of 2,700 s. The largest loss at this step is equipment downtime (uptime 86%), about 470 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Real Estate Dev, Permits & Facility Ops: Real Estate Dev, Permits & Facility Ops