Drone LiDAR Topographic & Cadastral Land Survey
Product family: Millimeter As-Built Mapping.
Flow: RTK Base & UAV LiDAR Rig → Flight Airspace & GCP Targets → UAV LiDAR / Ortho Capture → Point-Cloud Noise Classification → CAD Contour & Boundary Sign → GIS Portal GeoTIFF Delivery → Civil Designers & Developers
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Flight Airspace & GCP Targets | 837 s | 10 min | 97% | 91.5% | 6 | 30 (1.50 d) | 27 |
| 2. UAV LiDAR / Ortho Capture | 1,445 s | 15 min | 86% | 88.5% | 5 | 64 (3.20 d) | 12 |
| 3. Point-Cloud Noise Classification | 1,134 s | 15 min | 91% | 95.8% | 4 | 36 (1.80 d) | 17 |
| 4. CAD Contour & Boundary Sign | 945 s | 8 min | 95% | 97.8% | 3 | 18 (0.90 d) | 23 |
| 5. GIS Portal GeoTIFF Delivery | 648 s | 5 min | 98% | 99.1% | 2 | 8 (0.40 d) | 36 |
Key figures
- Takt time
- 1,350 s
- Lead time
- 8.39 d
- Value-added time
- 5,009 s
- Process cycle efficiency (PCE)
- 2.2%
- Rolled throughput yield (RTY)
- 75.2%
- Customer demand per day
- 20 cases
- Line capacity per day
- 12 cases
- Bottleneck
- UAV LiDAR / Ortho Capture
Reading the bottleneck
The bottleneck is "UAV LiDAR / Ortho Capture": it can process 12 cases per day against a demand of 20 cases, so it falls short of demand by 38.4%. Once downtime and scrap are counted, its cycle time grows from 1,445 s to 1,899 s, against a takt of 1,350 s. The largest loss at this step is equipment downtime (uptime 86%), about 235 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Real Estate Dev, Permits & Facility Ops: Real Estate Dev, Permits & Facility Ops
- Municipal Digital BIM Building Permit Review
- Corporate Office Fit-Out Design-Build Handover
- Multi-Site Commercial HVAC Preventive Maintenance
- Pre-Handover New Apartment Snagging & Close
- Commercial Building Deep Energy & Heat-Pump Retro
- Annual Statutory Elevator & Escalator Safety Audit
- Pre-Demolition Hazardous Asbestos Abatement Flow
- Build-to-Rent Apartment Move-Out Make-Ready
- Institutional Portfolio RICS Property Appraisal
- Multi-Tenant Commercial Smart Water/Elec Metering
- Multi-Unit Residential Garage EV Charger Install