Drone LiDAR Topographic & Cadastral Land Survey

Product family: Millimeter As-Built Mapping.

Flow: RTK Base & UAV LiDAR Rig → Flight Airspace & GCP Targets → UAV LiDAR / Ortho Capture → Point-Cloud Noise Classification → CAD Contour & Boundary Sign → GIS Portal GeoTIFF Delivery → Civil Designers & Developers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Drone LiDAR Topographic & Cadastral Land SurveySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. RTK Base & UAV LiDAR Rig → Flight Airspace & GCP Targets (837 s) → UAV LiDAR / Ortho Capture (1,445 s) → Point-Cloud Noise Classification (1,134 s) → CAD Contour & Boundary Sign (945 s) → GIS Portal GeoTIFF Delivery (648 s) → Civil Designers & Developers.SUPPLIERRTK Base & UAVLiDAR RigI1.50 d1Flight Airspace &GCP TargetsC/T 837 sI3.20 d2UAV LiDAR / OrthoCaptureC/T 1,445 sI1.80 d3Point-Cloud NoiseClassificationC/T 1,134 sI0.90 d4CAD Contour &Boundary SignC/T 945 sI0.40 d5GIS PortalGeoTIFF DeliveryC/T 648 sI0.40 dCUSTOMERCivil Designers& Developers20 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Flight Airspace & GCP Targets837 s10 min97%91.5%630 (1.50 d)27
2. UAV LiDAR / Ortho Capture1,445 s15 min86%88.5%564 (3.20 d)12
3. Point-Cloud Noise Classification1,134 s15 min91%95.8%436 (1.80 d)17
4. CAD Contour & Boundary Sign945 s8 min95%97.8%318 (0.90 d)23
5. GIS Portal GeoTIFF Delivery648 s5 min98%99.1%28 (0.40 d)36

Key figures

Takt time
1,350 s
Lead time
8.39 d
Value-added time
5,009 s
Process cycle efficiency (PCE)
2.2%
Rolled throughput yield (RTY)
75.2%
Customer demand per day
20 cases
Line capacity per day
12 cases
Bottleneck
UAV LiDAR / Ortho Capture

Reading the bottleneck

The bottleneck is "UAV LiDAR / Ortho Capture": it can process 12 cases per day against a demand of 20 cases, so it falls short of demand by 38.4%. Once downtime and scrap are counted, its cycle time grows from 1,445 s to 1,899 s, against a takt of 1,350 s. The largest loss at this step is equipment downtime (uptime 86%), about 235 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Real Estate Dev, Permits & Facility Ops: Real Estate Dev, Permits & Facility Ops