Multi-Unit Residential Garage EV Charger Install

Product family: Load-Balanced Condominium Fit.

Flow: 22kW AC Wallboxes & Busway → Transformer Capacity & Fire Eval → Board Approval & Subsidy File → Flat-Busbar Overhead Trunk → Wallbox Drop & RFID Pair → Load-Management Test & Go → Condo Associations

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Multi-Unit Residential Garage EV Charger InstallSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. 22kW AC Wallboxes & Busway → Transformer Capacity & Fire Eval (930 s) → Board Approval & Subsidy File (1,605 s) → Flat-Busbar Overhead Trunk (1,260 s) → Wallbox Drop & RFID Pair (1,050 s) → Load-Management Test & Go (720 s) → Condo Associations.SUPPLIER22kW ACWallboxes &BuswayI1.50 d1TransformerCapacity & Fire…C/T 930 sI3.22 d2Board Approval &Subsidy FileC/T 1,605 sI1.78 d3Flat-BusbarOverhead TrunkC/T 1,260 sI0.89 d4Wallbox Drop &RFID PairC/T 1,050 sI0.39 d5Load-ManagementTest & GoC/T 720 sI0.39 dCUSTOMERCondoAssociations18 / cases

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Transformer Capacity & Fire Eval930 s10 min97%91.5%527 (1.50 d)24
2. Board Approval & Subsidy File1,605 s15 min86%88.5%558 (3.22 d)11
3. Flat-Busbar Overhead Trunk1,260 s15 min91%95.8%432 (1.78 d)16
4. Wallbox Drop & RFID Pair1,050 s8 min95%97.8%316 (0.89 d)21
5. Load-Management Test & Go720 s5 min98%99.1%27 (0.39 d)33

Key figures

Takt time
1,500 s
Lead time
8.37 d
Value-added time
5,565 s
Process cycle efficiency (PCE)
2.5%
Rolled throughput yield (RTY)
75.2%
Customer demand per day
18 cases
Line capacity per day
11 cases
Bottleneck
Board Approval & Subsidy File

Reading the bottleneck

The bottleneck is "Board Approval & Subsidy File": it can process 11 cases per day against a demand of 18 cases, so it falls short of demand by 37.4%. Once downtime and scrap are counted, its cycle time grows from 1,605 s to 2,109 s, against a takt of 1,500 s. The largest loss at this step is equipment downtime (uptime 86%), about 261 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.