Multi-Unit Residential Garage EV Charger Install
Product family: Load-Balanced Condominium Fit.
Flow: 22kW AC Wallboxes & Busway → Transformer Capacity & Fire Eval → Board Approval & Subsidy File → Flat-Busbar Overhead Trunk → Wallbox Drop & RFID Pair → Load-Management Test & Go → Condo Associations
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Transformer Capacity & Fire Eval | 930 s | 10 min | 97% | 91.5% | 5 | 27 (1.50 d) | 24 |
| 2. Board Approval & Subsidy File | 1,605 s | 15 min | 86% | 88.5% | 5 | 58 (3.22 d) | 11 |
| 3. Flat-Busbar Overhead Trunk | 1,260 s | 15 min | 91% | 95.8% | 4 | 32 (1.78 d) | 16 |
| 4. Wallbox Drop & RFID Pair | 1,050 s | 8 min | 95% | 97.8% | 3 | 16 (0.89 d) | 21 |
| 5. Load-Management Test & Go | 720 s | 5 min | 98% | 99.1% | 2 | 7 (0.39 d) | 33 |
Key figures
- Takt time
- 1,500 s
- Lead time
- 8.37 d
- Value-added time
- 5,565 s
- Process cycle efficiency (PCE)
- 2.5%
- Rolled throughput yield (RTY)
- 75.2%
- Customer demand per day
- 18 cases
- Line capacity per day
- 11 cases
- Bottleneck
- Board Approval & Subsidy File
Reading the bottleneck
The bottleneck is "Board Approval & Subsidy File": it can process 11 cases per day against a demand of 18 cases, so it falls short of demand by 37.4%. Once downtime and scrap are counted, its cycle time grows from 1,605 s to 2,109 s, against a takt of 1,500 s. The largest loss at this step is equipment downtime (uptime 86%), about 261 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Real Estate Dev, Permits & Facility Ops: Real Estate Dev, Permits & Facility Ops
- Municipal Digital BIM Building Permit Review
- Corporate Office Fit-Out Design-Build Handover
- Multi-Site Commercial HVAC Preventive Maintenance
- Pre-Handover New Apartment Snagging & Close
- Commercial Building Deep Energy & Heat-Pump Retro
- Annual Statutory Elevator & Escalator Safety Audit
- Pre-Demolition Hazardous Asbestos Abatement Flow
- Build-to-Rent Apartment Move-Out Make-Ready
- Institutional Portfolio RICS Property Appraisal
- Multi-Tenant Commercial Smart Water/Elec Metering
- Drone LiDAR Topographic & Cadastral Land Survey