Institutional Portfolio RICS Property Appraisal

Product family: Annual Fund NAV Valuation.

Flow: Comp Market Lease DB → Data Room Rent Roll Verify → On-Site Physical Condition → DCF Cashflow Model Update → Peer RICS Review Committee → Signed Valuation Book Release → Real Estate Private Equity

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Institutional Portfolio RICS Property AppraisalSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Comp Market Lease DB → Data Room Rent Roll Verify (698 s) → On-Site Physical Condition (1,204 s) → DCF Cashflow Model Update (945 s) → Peer RICS Review Committee (788 s) → Signed Valuation Book Release (540 s) → Real Estate Private Equity.SUPPLIERComp MarketLease DBI1.50 d1Data Room RentRoll VerifyC/T 698 sI3.21 d2On-Site PhysicalConditionC/T 1,204 sI1.79 d3DCF CashflowModel UpdateC/T 945 sI0.92 d4Peer RICS ReviewCommitteeC/T 788 sI0.42 d5Signed ValuationBook ReleaseC/T 540 sI0.42 dCUSTOMERReal EstatePrivate Equity24 / files

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Data Room Rent Roll Verify698 s10 min97%91.5%736 (1.50 d)32
2. On-Site Physical Condition1,204 s15 min86%88.5%677 (3.21 d)15
3. DCF Cashflow Model Update945 s15 min91%95.8%543 (1.79 d)21
4. Peer RICS Review Committee788 s8 min95%97.8%422 (0.92 d)28
5. Signed Valuation Book Release540 s5 min98%99.1%210 (0.42 d)42

Key figures

Takt time
1,125 s
Lead time
8.40 d
Value-added time
4,175 s
Process cycle efficiency (PCE)
1.8%
Rolled throughput yield (RTY)
75.2%
Customer demand per day
24 files
Line capacity per day
15 files
Bottleneck
On-Site Physical Condition

Reading the bottleneck

The bottleneck is "On-Site Physical Condition": it can process 15 files per day against a demand of 24 files, so it falls short of demand by 38.4%. Once downtime and scrap are counted, its cycle time grows from 1,204 s to 1,582 s, against a takt of 1,125 s. The largest loss at this step is equipment downtime (uptime 86%), about 196 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Real Estate Dev, Permits & Facility Ops: Real Estate Dev, Permits & Facility Ops