Meat, Poultry & Seafood Processing VSM Scenarios

12 scenarios of Meat, Poultry & Seafood Processing, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.

Shared steps

All 12 scenarios follow the same flow, from supplier to customer: Chilled Intake & Trim / Fillet → Portion Cut, Brine & Tumbling → MAP Tray Seal / IQF Tunnel → Metal Detect & Dynamic Label → Case Pack & Chill 0–2°C Dock. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.

Scenario comparison

Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.

ScenarioDemandShiftsTaktLead timePCEBottleneck
400g Skinless Poultry Breast MAP Tray Line16,000 packs per day23.4 s3.50 d0.007%MAP Gas Tray Seal
Norwegian Salmon Fillet Vacuum Skin Pack (VSP)11,000 packs per day24.9 s3.50 d0.010%VSP Thermoform Barrier Film
80/20 Frozen Beef Burger Patty IQF Tunnel28,000 packs per day21.9 s3.50 d0.004%Cryogenic -70°C Crust Freeze
18-Month Dry-Cured Ham High-Speed Slicing14,000 packs per day23.9 s3.50 d0.008%Optical Fat-Ratio Sort & Stack
Peeled & Deveined Frozen Shrimp Glaze Line12,000 packs per day24.5 s3.50 d0.009%Individual Belt IQF Blast
High-Moisture Twin-Screw Plant Protein Burger18,000 packs per day23.0 s3.50 d0.006%Forming Drum & Steam Grill Mark
Slow-Cooked Sous-Vide Chef Sauce & Protein9,500 packs per day25.7 s3.50 d0.012%85°C Water-Bath Precision Cook
Continuous Beechwood Smoke Frankfurter Line34,000 packs per day32.4 s3.50 d0.003%Continuous Smoke-Steam-Chill
400-Case/Hr Optical Shell Egg Wash & Pack42,000 packs per day21.3 s3.50 d0.003%Precision Weight Scale Lane Drop
Steamed Skipjack Tuna Retort Olive-Oil Can48,000 packs per day31.7 s3.50 d0.002%High-Speed Chunk Pack & Oil
Continuous Sheeted Alaska Pollock Surimi Crab22,000 packs per day22.5 s3.50 d0.005%Slit Fibers & Color Bundle
Fresh Triple-Wash Chilled Deli Pasta Salad15,000 packs per day23.6 s3.50 d0.007%Foil Heat-Seal Film Membrane