Continuous Sheeted Alaska Pollock Surimi Crab

Product family: Chilled Shredded Surimi Packs.

Flow: Pacific Pollock Surimi Blocks → Grind Vacuum Silent Cutter → Slot Extrude onto Steam Drum → Slit Fibers & Color Bundle → Twist Roll & Rotary Cut → Vacuum MAP & Pasteurize → Retail Seafood & Sushi

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Continuous Sheeted Alaska Pollock Surimi CrabSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Pacific Pollock Surimi Blocks → Grind Vacuum Silent Cutter (1.7 s) → Slot Extrude onto Steam Drum (2.0 s) → Slit Fibers & Color Bundle (2.6 s) → Twist Roll & Rotary Cut (1.7 s) → Vacuum MAP & Pasteurize (1.4 s) → Retail Seafood & Sushi.SUPPLIERPacific PollockSurimi BlocksI0.60 d1Grind VacuumSilent CutterC/T 1.7 sI0.70 d2Slot Extrude ontoSteam DrumC/T 2.0 sI0.90 d3Slit Fibers &Color BundleC/T 2.6 sI0.40 d4Twist Roll &Rotary CutC/T 1.7 sI0.40 d5Vacuum MAP &PasteurizeC/T 1.4 sI0.50 dCUSTOMERRetail Seafood& Sushi22,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Grind Vacuum Silent Cutter1.7 s15 min95%97.6%6,60013,200 (0.60 d)27,816
2. Slot Extrude onto Steam Drum2.0 s20 min92%98.2%8,80015,400 (0.70 d)23,038
3. Slit Fibers & Color Bundle2.6 s30 min84%96.4%11,00019,800 (0.90 d)15,697
4. Twist Roll & Rotary Cut1.7 s10 min95%98.8%4,4008,800 (0.40 d)28,158
5. Vacuum MAP & Pasteurize1.4 s8 min97%99.4%4,4008,800 (0.40 d)35,537

Key figures

Takt time
2.5 s
Lead time
3.50 d
Value-added time
9.4 s
Process cycle efficiency (PCE)
0.005%
Rolled throughput yield (RTY)
90.7%
Customer demand per day
22,000 packs
Line capacity per day
15,697 packs
Bottleneck
Slit Fibers & Color Bundle

Reading the bottleneck

The bottleneck is "Slit Fibers & Color Bundle": it can process 15,697 packs per day against a demand of 22,000 packs, so it falls short of demand by 28.7%. Once downtime and scrap are counted, its cycle time grows from 2.6 s to 3.2 s, against a takt of 2.5 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Meat, Poultry & Seafood Processing: Meat, Poultry & Seafood Processing