Norwegian Salmon Fillet Vacuum Skin Pack (VSP)

Product family: Sushi/Smoked Skin-Tight Trays.

Flow: Aquaculture Harvest Pens → Automatic Pin-Bone & Skin → 250g Fixed-Weight Jet Slice → VSP Thermoform Barrier Film → Salt-Smoke / Chilled Set → Metal Check & Thermal Label → European Seafood Retailers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Norwegian Salmon Fillet Vacuum Skin Pack (VSP)Supplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aquaculture Harvest Pens → Automatic Pin-Bone & Skin (3.4 s) → 250g Fixed-Weight Jet Slice (4.0 s) → VSP Thermoform Barrier Film (5.3 s) → Salt-Smoke / Chilled Set (3.4 s) → Metal Check & Thermal Label (2.7 s) → European Seafood Retailers.SUPPLIERAquacultureHarvest PensI0.60 d1AutomaticPin-Bone & SkinC/T 3.4 sI0.70 d2250g Fixed-WeightJet SliceC/T 4.0 sI0.90 d3VSP ThermoformBarrier FilmC/T 5.3 sI0.40 d4Salt-Smoke /Chilled SetC/T 3.4 sI0.40 d5Metal Check &Thermal LabelC/T 2.7 sI0.50 dCUSTOMEREuropeanSeafood…11,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Automatic Pin-Bone & Skin3.4 s15 min95%97.6%3,3006,600 (0.60 d)13,908
2. 250g Fixed-Weight Jet Slice4.0 s20 min92%98.2%4,4007,700 (0.70 d)11,519
3. VSP Thermoform Barrier Film5.3 s30 min84%96.4%5,5009,900 (0.90 d)7,700
4. Salt-Smoke / Chilled Set3.4 s10 min95%98.8%2,2004,400 (0.40 d)14,079
5. Metal Check & Thermal Label2.7 s8 min97%99.4%2,2004,400 (0.40 d)18,427

Key figures

Takt time
4.9 s
Lead time
3.50 d
Value-added time
18.8 s
Process cycle efficiency (PCE)
0.010%
Rolled throughput yield (RTY)
90.7%
Customer demand per day
11,000 packs
Line capacity per day
7,700 packs
Bottleneck
VSP Thermoform Barrier Film

Reading the bottleneck

The bottleneck is "VSP Thermoform Barrier Film": it can process 7,700 packs per day against a demand of 11,000 packs, so it falls short of demand by 30.0%. Once downtime and scrap are counted, its cycle time grows from 5.3 s to 6.5 s, against a takt of 4.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 1.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Meat, Poultry & Seafood Processing: Meat, Poultry & Seafood Processing