Peeled & Deveined Frozen Shrimp Glaze Line

Product family: 1kg IQF Polybag Tail-On Shrimp.

Flow: Aquaculture Ice Boats → Optical Roller Peeler & Devein → Size Grader & Steam Blanch → Individual Belt IQF Blast → Chilled Water 10% Ice Glaze → Multi-Head Weigh Bag & -20°C → Foodservice & Retail

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Peeled & Deveined Frozen Shrimp Glaze LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Aquaculture Ice Boats → Optical Roller Peeler & Devein (3.1 s) → Size Grader & Steam Blanch (3.7 s) → Individual Belt IQF Blast (4.8 s) → Chilled Water 10% Ice Glaze (3.1 s) → Multi-Head Weigh Bag & -20°C (2.5 s) → Foodservice & Retail.SUPPLIERAquaculture IceBoatsI0.60 d1Optical RollerPeeler & DeveinC/T 3.1 sI0.70 d2Size Grader &Steam BlanchC/T 3.7 sI0.90 d3Individual BeltIQF BlastC/T 4.8 sI0.40 d4Chilled Water 10%Ice GlazeC/T 3.1 sI0.40 d5Multi-Head WeighBag & -20°CC/T 2.5 sI0.50 dCUSTOMERFoodservice &Retail12,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Optical Roller Peeler & Devein3.1 s15 min95%97.6%3,6007,200 (0.60 d)15,254
2. Size Grader & Steam Blanch3.7 s20 min92%98.2%4,8008,400 (0.70 d)12,453
3. Individual Belt IQF Blast4.8 s30 min84%96.4%6,00010,800 (0.90 d)8,502
4. Chilled Water 10% Ice Glaze3.1 s10 min95%98.8%2,4004,800 (0.40 d)15,441
5. Multi-Head Weigh Bag & -20°C2.5 s8 min97%99.4%2,4004,800 (0.40 d)19,901

Key figures

Takt time
4.5 s
Lead time
3.50 d
Value-added time
17.2 s
Process cycle efficiency (PCE)
0.009%
Rolled throughput yield (RTY)
90.7%
Customer demand per day
12,000 packs
Line capacity per day
8,502 packs
Bottleneck
Individual Belt IQF Blast

Reading the bottleneck

The bottleneck is "Individual Belt IQF Blast": it can process 8,502 packs per day against a demand of 12,000 packs, so it falls short of demand by 29.1%. Once downtime and scrap are counted, its cycle time grows from 4.8 s to 5.9 s, against a takt of 4.5 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.