Slow-Cooked Sous-Vide Chef Sauce & Protein

Product family: 72h Low-Temp Pasteurized Pouches.

Flow: Marinated Poultry & Pork Cuts → Tumble Marinade & Auger Dose → Rotary Chamber Vacuum Pouch → 85°C Water-Bath Precision Cook → Ice-Bank Rapid Chill to 2°C → High-Press Post-Pasteurize → Restaurants & Airlines

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Slow-Cooked Sous-Vide Chef Sauce & ProteinSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Marinated Poultry & Pork Cuts → Tumble Marinade & Auger Dose (4.0 s) → Rotary Chamber Vacuum Pouch (4.7 s) → 85°C Water-Bath Precision Cook (6.1 s) → Ice-Bank Rapid Chill to 2°C (4.0 s) → High-Press Post-Pasteurize (3.2 s) → Restaurants & Airlines.SUPPLIERMarinatedPoultry & PorkCutsI0.60 d1Tumble Marinade &Auger DoseC/T 4.0 sI0.70 d2Rotary ChamberVacuum PouchC/T 4.7 sI0.90 d385°C Water-BathPrecision CookC/T 6.1 sI0.40 d4Ice-Bank RapidChill to 2°CC/T 4.0 sI0.40 d5High-PressPost-PasteurizeC/T 3.2 sI0.50 dCUSTOMERRestaurants &Airlines9,500 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Tumble Marinade & Auger Dose4.0 s15 min95%97.6%2,8505,700 (0.60 d)11,822
2. Rotary Chamber Vacuum Pouch4.7 s20 min92%98.2%3,8006,650 (0.70 d)9,803
3. 85°C Water-Bath Precision Cook6.1 s30 min84%96.4%4,7508,550 (0.90 d)6,690
4. Ice-Bank Rapid Chill to 2°C4.0 s10 min95%98.8%1,9003,800 (0.40 d)11,967
5. High-Press Post-Pasteurize3.2 s8 min97%99.4%1,9003,800 (0.40 d)15,547

Key figures

Takt time
5.7 s
Lead time
3.50 d
Value-added time
22.0 s
Process cycle efficiency (PCE)
0.012%
Rolled throughput yield (RTY)
90.7%
Customer demand per day
9,500 packs
Line capacity per day
6,690 packs
Bottleneck
85°C Water-Bath Precision Cook

Reading the bottleneck

The bottleneck is "85°C Water-Bath Precision Cook": it can process 6,690 packs per day against a demand of 9,500 packs, so it falls short of demand by 29.6%. Once downtime and scrap are counted, its cycle time grows from 6.1 s to 7.5 s, against a takt of 5.7 s. The largest loss at this step is equipment downtime (uptime 84%), about 1.2 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Meat, Poultry & Seafood Processing: Meat, Poultry & Seafood Processing