400g Skinless Poultry Breast MAP Tray Line

Product family: Zero-Drip Modified Atmosphere.

Flow: Primary Poultry Abattoirs → Chilled Fillet Grade & Trim → Vision Waterjet Portion Cut → MAP Gas Tray Seal → X-Ray Bone & Dynamic Weigh → Crate Sort to +1°C Dispatch → Supermarket Chilled Meat

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 400g Skinless Poultry Breast MAP Tray LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Primary Poultry Abattoirs → Chilled Fillet Grade & Trim (2.4 s) → Vision Waterjet Portion Cut (2.8 s) → MAP Gas Tray Seal (3.6 s) → X-Ray Bone & Dynamic Weigh (2.4 s) → Crate Sort to +1°C Dispatch (1.9 s) → Supermarket Chilled Meat.SUPPLIERPrimary PoultryAbattoirsI0.60 d1Chilled FilletGrade & TrimC/T 2.4 sI0.70 d2Vision WaterjetPortion CutC/T 2.8 sI0.90 d3MAP Gas Tray SealC/T 3.6 sI0.40 d4X-Ray Bone &Dynamic WeighC/T 2.4 sI0.40 d5Crate Sort to+1°C DispatchC/T 1.9 sI0.50 dCUSTOMERSupermarketChilled Meat16,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Chilled Fillet Grade & Trim2.4 s15 min95%97.6%4,8009,600 (0.60 d)19,703
2. Vision Waterjet Portion Cut2.8 s20 min92%98.2%6,40011,200 (0.70 d)16,456
3. MAP Gas Tray Seal3.6 s30 min84%96.4%8,00014,400 (0.90 d)11,337
4. X-Ray Bone & Dynamic Weigh2.4 s10 min95%98.8%3,2006,400 (0.40 d)19,945
5. Crate Sort to +1°C Dispatch1.9 s8 min97%99.4%3,2006,400 (0.40 d)26,185

Key figures

Takt time
3.4 s
Lead time
3.50 d
Value-added time
13.1 s
Process cycle efficiency (PCE)
0.007%
Rolled throughput yield (RTY)
90.7%
Customer demand per day
16,000 packs
Line capacity per day
11,337 packs
Bottleneck
MAP Gas Tray Seal

Reading the bottleneck

The bottleneck is "MAP Gas Tray Seal": it can process 11,337 packs per day against a demand of 16,000 packs, so it falls short of demand by 29.1%. Once downtime and scrap are counted, its cycle time grows from 3.6 s to 4.4 s, against a takt of 3.4 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.7 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Meat, Poultry & Seafood Processing: Meat, Poultry & Seafood Processing