Edible Oils, Milling, Coffee & Dry Goods VSM Scenarios
12 scenarios of Edible Oils, Milling, Coffee & Dry Goods, built on the same five steps. They differ by scale: demand, shifts, cycle times and buffers.
Shared steps
All 12 scenarios follow the same flow, from supplier to customer: Optical Grain Clean & Destone → Mill / Decant / Roast Process → High-Speed Bag / Bottle Fill → Moisture / Peroxide Lab Release → Bag-in-Box & Export Pallet. What changes from one scenario to the next is the volume and the pace, so the same step can be the constraint in one scenario and not in another.
Scenario comparison
Choose the scenario closest to your daily demand and shift pattern, then adjust the figures in the editor. All values are illustrative starting points.
| Scenario | Demand | Shifts | Takt | Lead time | PCE | Bottleneck |
|---|---|---|---|---|---|---|
| Cold-Extracted Extra Virgin Olive Oil Bottle Line | 14,000 packs per day | 2 | 3.9 s | 9.20 d | 0.003% | Gravity UV-Glass Fill & Pourer |
| 400-Ton/Day Pneumatic Wheat Flour Mill | 18,000 packs per day | 3 | 4.5 s | 9.20 d | 0.002% | Air-Classified Purifier Blend |
| Bronze-Die High-Temp Durum Spaghetti Line | 38,000 packs per day | 3 | 2.1 s | 9.20 d | 0.001% | Humidity Equilibrium & Stripping |
| Fluid-Bed Coffee Roasting & N2 Valve Bag Line | 11,000 packs per day | 2 | 4.9 s | 9.20 d | 0.004% | 24h CO2 Degassing Silos |
| Hot-Break 36° Brix Aseptic Tomato Paste Drum | 850 batches per day | 3 | 95.3 s | 9.20 d | 0.049% | 4-Effect Vacuum Evaporator |
| Continuous Wash-Slice-Fry Potato Chip Bag Line | 36,000 packs per day | 3 | 2.3 s | 9.20 d | 0.001% | Optical Defect Belt & Flavor |
| Inline Colloid Mill Emulsion Mayo Glass Jar Line | 22,000 packs per day | 2 | 2.5 s | 9.20 d | 0.002% | Rotary Glass Depal & Fill |
| Steam-Parboiled & Optical Color-Sorted Rice Line | 16,000 packs per day | 2 | 3.4 s | 9.20 d | 0.003% | Chute Optical Color Sort |
| Vacuum Pan Refined White Beet Sugar Pack Line | 48,000 packs per day | 3 | 1.7 s | 9.20 d | 0.001% | Fluid-Bed Dryer & Sieve Grade |
| Hulled Stone-Milled Roasted Sesame Tahini Line | 9,500 packs per day | 2 | 5.7 s | 9.20 d | 0.004% | Shell-Tube Paste Cool & Store |
| Steamed Rolled Durum Couscous Continuous Dryer | 24,000 packs per day | 2 | 2.3 s | 9.20 d | 0.002% | Vibratory Fluid-Bed Drying |
| Physically Refined Sunflower 5L PET Bottle Line | 28,000 packs per day | 3 | 2.9 s | 9.20 d | 0.001% | Combi PET Blow-Fill Weight |