Bronze-Die High-Temp Durum Spaghetti Line

Product family: 500g Window Carton Packs.

Flow: Amber Durum Semolina Mill → Vacuum Hydrated Extrusion → Pre-Dry & 90°C HT Dryer Cycle → Humidity Equilibrium & Stripping → Multi-Head Weigh Window Carton → X-Ray & Tray Bundle Shrink → Global Retail Dry Aisles

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Bronze-Die High-Temp Durum Spaghetti LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Amber Durum Semolina Mill → Vacuum Hydrated Extrusion (1.4 s) → Pre-Dry & 90°C HT Dryer Cycle (1.8 s) → Humidity Equilibrium & Stripping (2.3 s) → Multi-Head Weigh Window Carton (1.5 s) → X-Ray & Tray Bundle Shrink (1.2 s) → Global Retail Dry Aisles.SUPPLIERAmber DurumSemolina MillI1.80 d1Vacuum HydratedExtrusionC/T 1.4 sI1.60 d2Pre-Dry & 90°C HTDryer CycleC/T 1.8 sI1.70 d3HumidityEquilibrium &…C/T 2.3 sI1.10 d4Multi-Head WeighWindow CartonC/T 1.5 sI1.00 d5X-Ray & TrayBundle ShrinkC/T 1.2 sI2.00 dCUSTOMERGlobal RetailDry Aisles38,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Vacuum Hydrated Extrusion1.4 s25 min95%99.1%57,00068,400 (1.80 d)53,797
2. Pre-Dry & 90°C HT Dryer Cycle1.8 s45 min91%98.2%45,60060,800 (1.60 d)39,096
3. Humidity Equilibrium & Stripping2.3 s50 min84%96.5%38,00064,600 (1.70 d)27,490
4. Multi-Head Weigh Window Carton1.5 s10 min95%98.8%19,00041,800 (1.10 d)49,934
5. X-Ray & Tray Bundle Shrink1.2 s10 min97%99.5%15,20038,000 (1.00 d)63,941

Key figures

Takt time
2.1 s
Lead time
9.20 d
Value-added time
8.2 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
92.3%
Customer demand per day
38,000 packs
Line capacity per day
27,490 packs
Bottleneck
Humidity Equilibrium & Stripping

Reading the bottleneck

The bottleneck is "Humidity Equilibrium & Stripping": it can process 27,490 packs per day against a demand of 38,000 packs, so it falls short of demand by 27.7%. Once downtime and scrap are counted, its cycle time grows from 2.3 s to 2.8 s, against a takt of 2.1 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.4 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.