Continuous Wash-Slice-Fry Potato Chip Bag Line

Product family: 150g N2-Flushed Foil Bags.

Flow: High-Solids Processing Spuds → Abrasive Steam Peel & Slicer → Starch Wash & Continuous Fryer → Optical Defect Belt & Flavor → VFFS Nitrogen-Flush Bag Seal → Checkweigh & Acoustic Seal Box → Grocery & Convenience Stores

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Continuous Wash-Slice-Fry Potato Chip Bag LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. High-Solids Processing Spuds → Abrasive Steam Peel & Slicer (1.4 s) → Starch Wash & Continuous Fryer (1.9 s) → Optical Defect Belt & Flavor (2.4 s) → VFFS Nitrogen-Flush Bag Seal (1.6 s) → Checkweigh & Acoustic Seal Box (1.3 s) → Grocery & Convenience Stores.SUPPLIERHigh-SolidsProcessingSpudsI1.80 d1Abrasive SteamPeel & SlicerC/T 1.4 sI1.60 d2Starch Wash &Continuous FryerC/T 1.9 sI1.70 d3Optical DefectBelt & FlavorC/T 2.4 sI1.10 d4VFFSNitrogen-Flush…C/T 1.6 sI1.00 d5Checkweigh &Acoustic Seal BoxC/T 1.3 sI2.00 dCUSTOMERGrocery &Convenience…36,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Abrasive Steam Peel & Slicer1.4 s25 min95%99.1%54,00064,800 (1.80 d)53,797
2. Starch Wash & Continuous Fryer1.9 s45 min91%98.2%43,20057,600 (1.60 d)37,038
3. Optical Defect Belt & Flavor2.4 s50 min84%96.5%36,00061,200 (1.70 d)26,345
4. VFFS Nitrogen-Flush Bag Seal1.6 s10 min95%98.8%18,00039,600 (1.10 d)46,813
5. Checkweigh & Acoustic Seal Box1.3 s10 min97%99.5%14,40036,000 (1.00 d)59,023

Key figures

Takt time
2.3 s
Lead time
9.20 d
Value-added time
8.6 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
92.3%
Customer demand per day
36,000 packs
Line capacity per day
26,345 packs
Bottleneck
Optical Defect Belt & Flavor

Reading the bottleneck

The bottleneck is "Optical Defect Belt & Flavor": it can process 26,345 packs per day against a demand of 36,000 packs, so it falls short of demand by 26.8%. Once downtime and scrap are counted, its cycle time grows from 2.4 s to 3.0 s, against a takt of 2.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Edible Oils, Milling, Coffee & Dry Goods: Edible Oils, Milling, Coffee & Dry Goods