Fluid-Bed Coffee Roasting & N2 Valve Bag Line

Product family: 500g Whole Bean Degas Packs.

Flow: Green Arabica Bean Silos → Silo Blend & Air-Roast Curve → Water-Quench & Optical Sort → 24h CO2 Degassing Silos → 1-Way Valve Foil Vertical Bag → Checkweigh & Display Tray → Retail & Cafe Wholesale

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Fluid-Bed Coffee Roasting & N2 Valve Bag LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Green Arabica Bean Silos → Silo Blend & Air-Roast Curve (3.1 s) → Water-Quench & Optical Sort (4.1 s) → 24h CO2 Degassing Silos (5.3 s) → 1-Way Valve Foil Vertical Bag (3.5 s) → Checkweigh & Display Tray (2.7 s) → Retail & Cafe Wholesale.SUPPLIERGreen ArabicaBean SilosI1.80 d1Silo Blend &Air-Roast CurveC/T 3.1 sI1.60 d2Water-Quench &Optical SortC/T 4.1 sI1.70 d324h CO2 DegassingSilosC/T 5.3 sI1.10 d41-Way Valve FoilVertical BagC/T 3.5 sI1.00 d5Checkweigh &Display TrayC/T 2.7 sI2.00 dCUSTOMERRetail & CafeWholesale11,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Silo Blend & Air-Roast Curve3.1 s25 min95%99.1%16,50019,800 (1.80 d)16,096
2. Water-Quench & Optical Sort4.1 s45 min91%98.2%13,20017,600 (1.60 d)11,279
3. 24h CO2 Degassing Silos5.3 s50 min84%96.5%11,00018,700 (1.70 d)7,800
4. 1-Way Valve Foil Vertical Bag3.5 s10 min95%98.8%5,50012,100 (1.10 d)14,159
5. Checkweigh & Display Tray2.7 s10 min97%99.5%4,40011,000 (1.00 d)18,767

Key figures

Takt time
4.9 s
Lead time
9.20 d
Value-added time
18.7 s
Process cycle efficiency (PCE)
0.004%
Rolled throughput yield (RTY)
92.3%
Customer demand per day
11,000 packs
Line capacity per day
7,800 packs
Bottleneck
24h CO2 Degassing Silos

Reading the bottleneck

The bottleneck is "24h CO2 Degassing Silos": it can process 7,800 packs per day against a demand of 11,000 packs, so it falls short of demand by 29.1%. Once downtime and scrap are counted, its cycle time grows from 5.3 s to 6.5 s, against a takt of 4.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 1.0 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Edible Oils, Milling, Coffee & Dry Goods: Edible Oils, Milling, Coffee & Dry Goods