Steamed Rolled Durum Couscous Continuous Dryer

Product family: 1kg Instant Couscous Cartons.

Flow: Hard Wheat Semolina Mill → Hydrated Drum Agglomerator → Belt Tunnel Steam Gelatinize → Vibratory Fluid-Bed Drying → Multi-Deck Calibrating Sifter → Auto Cartoner & Checkweigh → Retail Export Distributors

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Steamed Rolled Durum Couscous Continuous DryerSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Hard Wheat Semolina Mill → Hydrated Drum Agglomerator (1.4 s) → Belt Tunnel Steam Gelatinize (1.9 s) → Vibratory Fluid-Bed Drying (2.4 s) → Multi-Deck Calibrating Sifter (1.6 s) → Auto Cartoner & Checkweigh (1.3 s) → Retail Export Distributors.SUPPLIERHard WheatSemolina MillI1.80 d1Hydrated DrumAgglomeratorC/T 1.4 sI1.60 d2Belt Tunnel SteamGelatinizeC/T 1.9 sI1.70 d3VibratoryFluid-Bed DryingC/T 2.4 sI1.10 d4Multi-DeckCalibrating…C/T 1.6 sI1.00 d5Auto Cartoner &CheckweighC/T 1.3 sI2.00 dCUSTOMERRetail ExportDistributors24,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Hydrated Drum Agglomerator1.4 s25 min95%99.1%36,00043,200 (1.80 d)35,641
2. Belt Tunnel Steam Gelatinize1.9 s45 min91%98.2%28,80038,400 (1.60 d)24,339
3. Vibratory Fluid-Bed Drying2.4 s50 min84%96.5%24,00040,800 (1.70 d)17,225
4. Multi-Deck Calibrating Sifter1.6 s10 min95%98.8%12,00026,400 (1.10 d)30,974
5. Auto Cartoner & Checkweigh1.3 s10 min97%99.5%9,60024,000 (1.00 d)38,977

Key figures

Takt time
2.3 s
Lead time
9.20 d
Value-added time
8.6 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
92.3%
Customer demand per day
24,000 packs
Line capacity per day
17,225 packs
Bottleneck
Vibratory Fluid-Bed Drying

Reading the bottleneck

The bottleneck is "Vibratory Fluid-Bed Drying": it can process 17,225 packs per day against a demand of 24,000 packs, so it falls short of demand by 28.2%. Once downtime and scrap are counted, its cycle time grows from 2.4 s to 3.0 s, against a takt of 2.3 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.