Inline Colloid Mill Emulsion Mayo Glass Jar Line

Product family: 450g Wide-Mouth Glass Jars.

Flow: Sunflower Oil & Pasteur Egg → Continuous Colloid Mill Premix → Vacuum De-Aerate & Hold QC → Rotary Glass Depal & Fill → Twist-Off Vacuum Cap & Steam → Case Erect & Pallet Stretch → Retail Condiment Shelves

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Inline Colloid Mill Emulsion Mayo Glass Jar LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Sunflower Oil & Pasteur Egg → Continuous Colloid Mill Premix (1.6 s) → Vacuum De-Aerate & Hold QC (2.1 s) → Rotary Glass Depal & Fill (2.6 s) → Twist-Off Vacuum Cap & Steam (1.8 s) → Case Erect & Pallet Stretch (1.4 s) → Retail Condiment Shelves.SUPPLIERSunflower Oil &Pasteur EggI1.80 d1ContinuousColloid Mill…C/T 1.6 sI1.60 d2Vacuum De-Aerate& Hold QCC/T 2.1 sI1.70 d3Rotary GlassDepal & FillC/T 2.6 sI1.10 d4Twist-Off VacuumCap & SteamC/T 1.8 sI1.00 d5Case Erect &Pallet StretchC/T 1.4 sI2.00 dCUSTOMERRetailCondiment…22,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Continuous Colloid Mill Premix1.6 s25 min95%99.1%33,00039,600 (1.80 d)31,186
2. Vacuum De-Aerate & Hold QC2.1 s45 min91%98.2%26,40035,200 (1.60 d)22,021
3. Rotary Glass Depal & Fill2.6 s50 min84%96.5%22,00037,400 (1.70 d)15,900
4. Twist-Off Vacuum Cap & Steam1.8 s10 min95%98.8%11,00024,200 (1.10 d)27,532
5. Case Erect & Pallet Stretch1.4 s10 min97%99.5%8,80022,000 (1.00 d)36,193

Key figures

Takt time
2.5 s
Lead time
9.20 d
Value-added time
9.5 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
92.3%
Customer demand per day
22,000 packs
Line capacity per day
15,900 packs
Bottleneck
Rotary Glass Depal & Fill

Reading the bottleneck

The bottleneck is "Rotary Glass Depal & Fill": it can process 15,900 packs per day against a demand of 22,000 packs, so it falls short of demand by 27.7%. Once downtime and scrap are counted, its cycle time grows from 2.6 s to 3.2 s, against a takt of 2.5 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.5 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Edible Oils, Milling, Coffee & Dry Goods: Edible Oils, Milling, Coffee & Dry Goods