Physically Refined Sunflower 5L PET Bottle Line

Product family: 1L & 5L Neutral Cooking Oil.

Flow: Crude Seed Crushers → Bleaching Earth & Dewax Filter → Steam Vacuum Deodorizer → Combi PET Blow-Fill Weight → Press-On Drip-Free Spout Cap → Wrap-Around Case Pallet → Wholesale & Retail Chains

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Physically Refined Sunflower 5L PET Bottle LineSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Crude Seed Crushers → Bleaching Earth & Dewax Filter (1.9 s) → Steam Vacuum Deodorizer (2.4 s) → Combi PET Blow-Fill Weight (3.1 s) → Press-On Drip-Free Spout Cap (2.1 s) → Wrap-Around Case Pallet (1.6 s) → Wholesale & Retail Chains.SUPPLIERCrude SeedCrushersI1.80 d1Bleaching Earth &Dewax FilterC/T 1.9 sI1.60 d2Steam VacuumDeodorizerC/T 2.4 sI1.70 d3Combi PETBlow-Fill WeightC/T 3.1 sI1.10 d4Press-OnDrip-Free Spout…C/T 2.1 sI1.00 d5Wrap-Around CasePalletC/T 1.6 sI2.00 dCUSTOMERWholesale &Retail Chains28,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Bleaching Earth & Dewax Filter1.9 s25 min95%99.1%42,00050,400 (1.80 d)39,640
2. Steam Vacuum Deodorizer2.4 s45 min91%98.2%33,60044,800 (1.60 d)29,322
3. Combi PET Blow-Fill Weight3.1 s50 min84%96.5%28,00047,600 (1.70 d)20,396
4. Press-On Drip-Free Spout Cap2.1 s10 min95%98.8%14,00030,800 (1.10 d)35,667
5. Wrap-Around Case Pallet1.6 s10 min97%99.5%11,20028,000 (1.00 d)47,956

Key figures

Takt time
2.9 s
Lead time
9.20 d
Value-added time
11.1 s
Process cycle efficiency (PCE)
0.001%
Rolled throughput yield (RTY)
92.3%
Customer demand per day
28,000 packs
Line capacity per day
20,396 packs
Bottleneck
Combi PET Blow-Fill Weight

Reading the bottleneck

The bottleneck is "Combi PET Blow-Fill Weight": it can process 20,396 packs per day against a demand of 28,000 packs, so it falls short of demand by 27.2%. Once downtime and scrap are counted, its cycle time grows from 3.1 s to 3.8 s, against a takt of 2.9 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.