400-Ton/Day Pneumatic Wheat Flour Mill

Product family: 1kg & 25kg Baker Flour Bags.

Flow: Grain Elevator Silos → Pneumatic Tempering 18h → Roller Break & Plan-Sifter Stack → Air-Classified Purifier Blend → 1kg Paper Form-Fill-Seal → Metal Magnet & Pallet Wrapper → Industrial & Retail Bakers

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: 400-Ton/Day Pneumatic Wheat Flour MillSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Grain Elevator Silos → Pneumatic Tempering 18h (2.9 s) → Roller Break & Plan-Sifter Stack (3.8 s) → Air-Classified Purifier Blend (4.8 s) → 1kg Paper Form-Fill-Seal (3.2 s) → Metal Magnet & Pallet Wrapper (2.5 s) → Industrial & Retail Bakers.SUPPLIERGrain ElevatorSilosI1.80 d1PneumaticTempering 18hC/T 2.9 sI1.60 d2Roller Break &Plan-Sifter StackC/T 3.8 sI1.70 d3Air-ClassifiedPurifier BlendC/T 4.8 sI1.10 d41kg PaperForm-Fill-SealC/T 3.2 sI1.00 d5Metal Magnet &Pallet WrapperC/T 2.5 sI2.00 dCUSTOMERIndustrial &Retail Bakers18,000 / packs

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Pneumatic Tempering 18h2.9 s25 min95%99.1%27,00032,400 (1.80 d)25,971
2. Roller Break & Plan-Sifter Stack3.8 s45 min91%98.2%21,60028,800 (1.60 d)18,519
3. Air-Classified Purifier Blend4.8 s50 min84%96.5%18,00030,600 (1.70 d)13,172
4. 1kg Paper Form-Fill-Seal3.2 s10 min95%98.8%9,00019,800 (1.10 d)23,406
5. Metal Magnet & Pallet Wrapper2.5 s10 min97%99.5%7,20018,000 (1.00 d)30,692

Key figures

Takt time
4.5 s
Lead time
9.20 d
Value-added time
17.2 s
Process cycle efficiency (PCE)
0.002%
Rolled throughput yield (RTY)
92.3%
Customer demand per day
18,000 packs
Line capacity per day
13,172 packs
Bottleneck
Air-Classified Purifier Blend

Reading the bottleneck

The bottleneck is "Air-Classified Purifier Blend": it can process 13,172 packs per day against a demand of 18,000 packs, so it falls short of demand by 26.8%. Once downtime and scrap are counted, its cycle time grows from 4.8 s to 5.9 s, against a takt of 4.5 s. The largest loss at this step is equipment downtime (uptime 84%), about 0.9 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Edible Oils, Milling, Coffee & Dry Goods: Edible Oils, Milling, Coffee & Dry Goods