Acute Ophthalmic Trauma & Retinal Detachment ER
Product family: Slit-Lamp Urgent Eye Track.
Flow: Sterile Fluorescein & Drops → Snellen Vision & Chemical Wash → Ophthalmic Nurse Drop Prep → Slit-Lamp & OCT Macula Scan → IOP Check or Laser Sealing → Shield Patch & 24h Return → Vitreoretinal OR / Home
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Snellen Vision & Chemical Wash | 315 s | 2 min | 98% | 97.5% | 5 | 17 (0.35 d) | 78 |
| 2. Ophthalmic Nurse Drop Prep | 439 s | 4 min | 94% | 95.8% | 5 | 26 (0.54 d) | 51 |
| 3. Slit-Lamp & OCT Macula Scan | 602 s | 12 min | 85% | 92.0% | 10 | 55 (1.15 d) | 31 |
| 4. IOP Check or Laser Sealing | 473 s | 6 min | 92% | 96.5% | 5 | 36 (0.75 d) | 44 |
| 5. Shield Patch & 24h Return | 349 s | 5 min | 94% | 97.2% | 5 | 31 (0.65 d) | 63 |
Key figures
- Takt time
- 563 s
- Lead time
- 3.77 d
- Value-added time
- 2,178 s
- Process cycle efficiency (PCE)
- 2.1%
- Rolled throughput yield (RTY)
- 80.6%
- Customer demand per day
- 48 patients
- Line capacity per day
- 31 patients
- Bottleneck
- Slit-Lamp & OCT Macula Scan
Reading the bottleneck
The bottleneck is "Slit-Lamp & OCT Macula Scan": it can process 31 patients per day against a demand of 48 patients, so it falls short of demand by 36.3%. Once downtime and scrap are counted, its cycle time grows from 602 s to 770 s, against a takt of 563 s. The largest loss at this step is equipment downtime (uptime 85%), about 106 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Emergency Medicine & Urgent Pathways: Emergency Medicine & Urgent Pathways
- Hospital Emergency Department (ED) Flow
- Code STEMI Heart-Attack Door-to-Balloon <60m
- Code Stroke Door-to-Needle tPA & Thrombectomy
- Child-Friendly Pediatric Urgent Fast-Track
- Level-1 Polytrauma Helicopter Resus Bay Flow
- Paramedic Ambulance ED Offload <15-Min Loop
- 24-Hour Rapid Chest Pain Observation Unit
- Virtual & Acute Orthopedic Cast Fracture ER
- Safe Behavioral Health Crisis Triage Unit
- Acute Thermal Burn Wound Stabilization Pathway
- Toxicology & Acute Overdose Decontamination Track