Paramedic Ambulance ED Offload <15-Min Loop

Product family: Zero-Ramping EMS Handover.

Flow: Municipal EMS Fleet → Pre-Arrival ETA Telemetry → Dedicated EMS Transfer Nurse → Quick Verbal MIST & Bed Flip → Bio-Clean Ambulance Bay → Unit Back-In-Service Green → ED Triage Transfer Dock

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Paramedic Ambulance ED Offload <15-Min LoopSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Municipal EMS Fleet → Pre-Arrival ETA Telemetry (698 s) → Dedicated EMS Transfer Nurse (972 s) → Quick Verbal MIST & Bed Flip (1,333 s) → Bio-Clean Ambulance Bay (1,047 s) → Unit Back-In-Service Green (773 s) → ED Triage Transfer Dock.SUPPLIERMunicipal EMSFleetI0.35 d1Pre-Arrival ETATelemetryC/T 698 sI0.55 d2Dedicated EMSTransfer NurseC/T 972 sI1.15 d3Quick Verbal MIST& Bed FlipC/T 1,333 sI0.75 d4Bio-CleanAmbulance BayC/T 1,047 sI0.65 d5UnitBack-In-Service…C/T 773 sI0.25 dCUSTOMERED TriageTransfer Dock65 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Pre-Arrival ETA Telemetry698 s2 min98%97.5%723 (0.35 d)109
2. Dedicated EMS Transfer Nurse972 s4 min94%95.8%736 (0.55 d)73
3. Quick Verbal MIST & Bed Flip1,333 s12 min85%92.0%1375 (1.15 d)45
4. Bio-Clean Ambulance Bay1,047 s6 min92%96.5%749 (0.75 d)66
5. Unit Back-In-Service Green773 s5 min94%97.2%742 (0.65 d)92

Key figures

Takt time
1,246 s
Lead time
3.77 d
Value-added time
4,823 s
Process cycle efficiency (PCE)
1.6%
Rolled throughput yield (RTY)
80.6%
Customer demand per day
65 patients
Line capacity per day
45 patients
Bottleneck
Quick Verbal MIST & Bed Flip

Reading the bottleneck

The bottleneck is "Quick Verbal MIST & Bed Flip": it can process 45 patients per day against a demand of 65 patients, so it falls short of demand by 30.1%. Once downtime and scrap are counted, its cycle time grows from 1,333 s to 1,705 s, against a takt of 1,246 s. The largest loss at this step is equipment downtime (uptime 85%), about 235 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.