Acute Thermal Burn Wound Stabilization Pathway

Product family: Hydrotherapy & Parkland Resus.

Flow: Silver Dressings & Grafts → Airway Check & Parkland IV → Heated Room Analgesia Sedate → Hydrotherapy Wound Debride → Silver Biological Wound Wrap → Temp-Controlled Burn Pod → Regional Burn ICU

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Acute Thermal Burn Wound Stabilization PathwaySupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Silver Dressings & Grafts → Airway Check & Parkland IV (4,536 s) → Heated Room Analgesia Sedate (6,318 s) → Hydrotherapy Wound Debride (8,667 s) → Silver Biological Wound Wrap (6,804 s) → Temp-Controlled Burn Pod (5,022 s) → Regional Burn ICU.SUPPLIERSilverDressings &GraftsI0.40 d1Airway Check &Parkland IVC/T 4,536 sI0.60 d2Heated RoomAnalgesia SedateC/T 6,318 sI1.20 d3HydrotherapyWound DebrideC/T 8,667 sI0.80 d4Silver BiologicalWound WrapC/T 6,804 sI0.70 d5Temp-ControlledBurn PodC/T 5,022 sI0.30 dCUSTOMERRegional BurnICU10 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Airway Check & Parkland IV4,536 s2 min98%97.5%14 (0.40 d)17
2. Heated Room Analgesia Sedate6,318 s4 min94%95.8%16 (0.60 d)12
3. Hydrotherapy Wound Debride8,667 s12 min85%92.0%212 (1.20 d)7
4. Silver Biological Wound Wrap6,804 s6 min92%96.5%18 (0.80 d)11
5. Temp-Controlled Burn Pod5,022 s5 min94%97.2%17 (0.70 d)15

Key figures

Takt time
8,100 s
Lead time
4.39 d
Value-added time
31,347 s
Process cycle efficiency (PCE)
8.8%
Rolled throughput yield (RTY)
80.6%
Customer demand per day
10 patients
Line capacity per day
7 patients
Bottleneck
Hydrotherapy Wound Debride

Reading the bottleneck

The bottleneck is "Hydrotherapy Wound Debride": it can process 7 patients per day against a demand of 10 patients, so it falls short of demand by 30.2%. Once downtime and scrap are counted, its cycle time grows from 8,667 s to 11,083 s, against a takt of 8,100 s. The largest loss at this step is equipment downtime (uptime 85%), about 1,529 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.