Toxicology & Acute Overdose Decontamination Track
Product family: Rapid Antidote & Tox Lab.
Flow: Regional Poison Control → Poison Center Phone Consult → Vitals, ECG QT & Tox Urine → Charcoal / Antidote Infuse → Telemetry Clearance Window → Behavioral Safety Check Exit → ED Tox / Telemetry Ward
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Poison Center Phone Consult | 2,062 s | 2 min | 98% | 97.5% | 2 | 8 (0.36 d) | 37 |
| 2. Vitals, ECG QT & Tox Urine | 2,872 s | 4 min | 94% | 95.8% | 2 | 12 (0.55 d) | 25 |
| 3. Charcoal / Antidote Infuse | 3,940 s | 12 min | 85% | 92.0% | 4 | 25 (1.14 d) | 15 |
| 4. Telemetry Clearance Window | 3,093 s | 6 min | 92% | 96.5% | 2 | 17 (0.77 d) | 22 |
| 5. Behavioral Safety Check Exit | 2,283 s | 5 min | 94% | 97.2% | 2 | 14 (0.64 d) | 31 |
Key figures
- Takt time
- 3,682 s
- Lead time
- 3.90 d
- Value-added time
- 14,250 s
- Process cycle efficiency (PCE)
- 4.5%
- Rolled throughput yield (RTY)
- 80.6%
- Customer demand per day
- 22 patients
- Line capacity per day
- 15 patients
- Bottleneck
- Charcoal / Antidote Infuse
Reading the bottleneck
The bottleneck is "Charcoal / Antidote Infuse": it can process 15 patients per day against a demand of 22 patients, so it falls short of demand by 30.5%. Once downtime and scrap are counted, its cycle time grows from 3,940 s to 5,038 s, against a takt of 3,682 s. The largest loss at this step is equipment downtime (uptime 85%), about 695 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Emergency Medicine & Urgent Pathways: Emergency Medicine & Urgent Pathways
- Hospital Emergency Department (ED) Flow
- Code STEMI Heart-Attack Door-to-Balloon <60m
- Code Stroke Door-to-Needle tPA & Thrombectomy
- Child-Friendly Pediatric Urgent Fast-Track
- Level-1 Polytrauma Helicopter Resus Bay Flow
- Paramedic Ambulance ED Offload <15-Min Loop
- 24-Hour Rapid Chest Pain Observation Unit
- Acute Ophthalmic Trauma & Retinal Detachment ER
- Virtual & Acute Orthopedic Cast Fracture ER
- Safe Behavioral Health Crisis Triage Unit
- Acute Thermal Burn Wound Stabilization Pathway