Child-Friendly Pediatric Urgent Fast-Track

Product family: ESI 3-5 Pediatric Acute Visits.

Flow: Pediatric Weight Dose Kit → Weight-Based Triage Band → Comfort Numbing Spray Prep → Fast-Track NP/Pediatrician → Nebulizer & Swab Rapid POCT → Parent Fever Guide Exit → Pediatric Families

Open this map in the free editor

No account needed. Change any value and the indicators update.

Value stream map

Value stream map: Child-Friendly Pediatric Urgent Fast-TrackSupplier on the left, customer on the right, process steps in between with their cycle time, and a stock triangle with days of stock before each step. Pediatric Weight Dose Kit → Weight-Based Triage Band (275 s) → Comfort Numbing Spray Prep (383 s) → Fast-Track NP/Pediatrician (525 s) → Nebulizer & Swab Rapid POCT (412 s) → Parent Fever Guide Exit (304 s) → Pediatric Families.SUPPLIERPediatricWeight Dose KitI0.35 d1Weight-BasedTriage BandC/T 275 sI0.55 d2Comfort NumbingSpray PrepC/T 383 sI1.15 d3Fast-TrackNP/PediatricianC/T 525 sI0.75 d4Nebulizer & SwabRapid POCTC/T 412 sI0.65 d5Parent FeverGuide ExitC/T 304 sI0.25 dCUSTOMERPediatricFamilies110 / patients

Process steps

StepCycle timeChangeoverUptimeYieldBatchStock beforeCapacity per day
1. Weight-Based Triage Band275 s2 min98%97.5%1139 (0.35 d)183
2. Comfort Numbing Spray Prep383 s4 min94%95.8%1161 (0.55 d)121
3. Fast-Track NP/Pediatrician525 s12 min85%92.0%22126 (1.15 d)75
4. Nebulizer & Swab Rapid POCT412 s6 min92%96.5%1183 (0.75 d)109
5. Parent Fever Guide Exit304 s5 min94%97.2%1172 (0.65 d)153

Key figures

Takt time
491 s
Lead time
3.75 d
Value-added time
1,899 s
Process cycle efficiency (PCE)
0.94%
Rolled throughput yield (RTY)
80.6%
Customer demand per day
110 patients
Line capacity per day
75 patients
Bottleneck
Fast-Track NP/Pediatrician

Reading the bottleneck

The bottleneck is "Fast-Track NP/Pediatrician": it can process 75 patients per day against a demand of 110 patients, so it falls short of demand by 31.8%. Once downtime and scrap are counted, its cycle time grows from 525 s to 671 s, against a takt of 491 s. The largest loss at this step is equipment downtime (uptime 85%), about 92.6 s per unit. Reducing that loss is where the first improvement test belongs.

The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.

Other scenarios in this family

More scenarios of Emergency Medicine & Urgent Pathways: Emergency Medicine & Urgent Pathways