Hospital Emergency Department (ED) Flow
Product family: Acuity ESI 2-4 ED Visits.
Flow: Central Lab & Blood Bank → Triage & Vitals → MD Rapid Exam → CT Imaging & Stat Lab → Acute Stabilization → Bed Pull / Discharge → Walk-In & EMS Patients
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. Triage & Vitals | 252 s | 2 min | 98% | 97.5% | 18 | 63 (0.35 d) | 303 |
| 2. MD Rapid Exam | 351 s | 4 min | 94% | 95.8% | 18 | 99 (0.55 d) | 202 |
| 3. CT Imaging & Stat Lab | 482 s | 12 min | 85% | 92.0% | 36 | 207 (1.15 d) | 126 |
| 4. Acute Stabilization | 378 s | 6 min | 92% | 96.5% | 18 | 135 (0.75 d) | 182 |
| 5. Bed Pull / Discharge | 279 s | 5 min | 94% | 97.2% | 18 | 117 (0.65 d) | 255 |
Key figures
- Takt time
- 450 s
- Lead time
- 3.72 d
- Value-added time
- 1,742 s
- Process cycle efficiency (PCE)
- 0.58%
- Rolled throughput yield (RTY)
- 80.6%
- Customer demand per day
- 180 patients
- Line capacity per day
- 126 patients
- Bottleneck
- CT Imaging & Stat Lab
Reading the bottleneck
The bottleneck is "CT Imaging & Stat Lab": it can process 126 patients per day against a demand of 180 patients, so it falls short of demand by 30.2%. Once downtime and scrap are counted, its cycle time grows from 482 s to 616 s, against a takt of 450 s. The largest loss at this step is equipment downtime (uptime 85%), about 85.1 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Emergency Medicine & Urgent Pathways: Emergency Medicine & Urgent Pathways
- Code STEMI Heart-Attack Door-to-Balloon <60m
- Code Stroke Door-to-Needle tPA & Thrombectomy
- Child-Friendly Pediatric Urgent Fast-Track
- Level-1 Polytrauma Helicopter Resus Bay Flow
- Paramedic Ambulance ED Offload <15-Min Loop
- 24-Hour Rapid Chest Pain Observation Unit
- Acute Ophthalmic Trauma & Retinal Detachment ER
- Virtual & Acute Orthopedic Cast Fracture ER
- Safe Behavioral Health Crisis Triage Unit
- Acute Thermal Burn Wound Stabilization Pathway
- Toxicology & Acute Overdose Decontamination Track