Code STEMI Heart-Attack Door-to-Balloon <60m
Product family: Emergency Cardiac PCI Track.
Flow: EMS Telemetry ECG Feed → EMS Pre-Hospital 12-Lead → ED Bypass Direct-to-Cath → Radial Puncture & Angioplasty → Thrombus & Balloon Open <45m → Coronary ICU Transfer → CCU Intensive Cardiac Care
No account needed. Change any value and the indicators update.
Value stream map
Process steps
| Step | Cycle time | Changeover | Uptime | Yield | Batch | Stock before | Capacity per day |
|---|---|---|---|---|---|---|---|
| 1. EMS Pre-Hospital 12-Lead | 7,560 s | 2 min | 98% | 97.5% | 1 | 2 (0.33 d) | 10 |
| 2. ED Bypass Direct-to-Cath | 10,530 s | 4 min | 94% | 95.8% | 1 | 3 (0.50 d) | 7 |
| 3. Radial Puncture & Angioplasty | 14,445 s | 12 min | 85% | 92.0% | 1 | 7 (1.17 d) | 4 |
| 4. Thrombus & Balloon Open <45m | 11,340 s | 6 min | 92% | 96.5% | 1 | 5 (0.83 d) | 6 |
| 5. Coronary ICU Transfer | 8,370 s | 5 min | 94% | 97.2% | 1 | 4 (0.67 d) | 9 |
Key figures
- Takt time
- 13,500 s
- Lead time
- 4.48 d
- Value-added time
- 52,245 s
- Process cycle efficiency (PCE)
- 14.4%
- Rolled throughput yield (RTY)
- 80.6%
- Customer demand per day
- 6 patients
- Line capacity per day
- 4 patients
- Bottleneck
- Radial Puncture & Angioplasty
Reading the bottleneck
The bottleneck is "Radial Puncture & Angioplasty": it can process 4 patients per day against a demand of 6 patients, so it falls short of demand by 27.6%. Once downtime and scrap are counted, its cycle time grows from 14,445 s to 18,472 s, against a takt of 13,500 s. The largest loss at this step is equipment downtime (uptime 85%), about 2,549 s per unit. Reducing that loss is where the first improvement test belongs.
The figures on this page are illustrative starting values to be replaced with your own measurements. They are not industry benchmarks.
Other scenarios in this family
More scenarios of Emergency Medicine & Urgent Pathways: Emergency Medicine & Urgent Pathways
- Hospital Emergency Department (ED) Flow
- Code Stroke Door-to-Needle tPA & Thrombectomy
- Child-Friendly Pediatric Urgent Fast-Track
- Level-1 Polytrauma Helicopter Resus Bay Flow
- Paramedic Ambulance ED Offload <15-Min Loop
- 24-Hour Rapid Chest Pain Observation Unit
- Acute Ophthalmic Trauma & Retinal Detachment ER
- Virtual & Acute Orthopedic Cast Fracture ER
- Safe Behavioral Health Crisis Triage Unit
- Acute Thermal Burn Wound Stabilization Pathway
- Toxicology & Acute Overdose Decontamination Track